INSP-Final Inspection | 9/25/2007 | 9/26/2007 | 9/26/2007 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Sprinkler Plan Check | 9/6/2007 | | 9/21/2007 | | PASS |
|
|
|
resubmittal done by bryan johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/21/2007 | | 9/21/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/21/2007 | | DONE |
|
|
|
t/c w jeff packham at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 9/21/2007 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/21/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/21/2007 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/21/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/20/2007 | | 9/20/2007 | | PASS |
|
|
|
Plan modifications reviewed by Johnson consulting. 14 more heads added to work load.
|
Plan resubmittals received | | | 9/6/2007 | | |
|
|
|
|
Plan resubmittals received | | | 9/6/2007 | | DONE |
|
|
|
Plan Modifications recieved by city.
|
INSP-Sprinkler Rough-in | 8/30/2007 | 8/31/2007 | 8/31/2007 | A | PASS |
Troy Cobbley
|
|
|
The remaining exposed piping is ok to cover. The contractor owes me an as-built plan as per the scope of work. After canopies and ceiling tile have been verified this project can be finaled
|
INSP-Sprinkler Rough-in | 8/23/2007 | 8/23/2007 | 8/24/2007 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations where the piping is ok to cover.
|
INSP-Sprinkler Rough-in | 8/23/2007 | 8/24/2007 | 8/24/2007 | A | PASS |
Troy Cobbley
|
|
|
Three more sprinkler heads in the first floor corridor are ok to cover. Rick removed conduit that was attached to the piping as I waited.
|
Override - People Holds | | | 8/23/2007 | | |
|
|
|
|
INSP-Sprinkler Rough-in | 8/14/2007 | 8/14/2007 | 8/14/2007 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping in the CEO corridor and the adjacent offices is ok to cover.
|
INSP-Sprinkler Rough-in | 7/30/2007 | 7/31/2007 | 7/31/2007 | A | PASS |
Troy Cobbley
|
|
|
The elevator lobby sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in | 7/23/2007 | 7/23/2007 | 7/23/2007 | P | PART |
Troy Cobbley
|
|
|
The six sprinkler heads in the corridor junction are ok to cover.
|
Application received | | | 5/25/2007 | | |
|
|
|
|
Sprinkler Plan Check | 5/25/2007 | | 5/25/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/25/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/25/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/25/2007 | | 5/25/2007 | | DONE |
|
|
|
|
Telephone call | | | 5/25/2007 | | DONE |
|
|
|
call to jeff, permit ready to pu and fee $150
|
Issue and Print Permit | | | 5/25/2007 | | DONE |
|
|
|
|
Pending Assignment by SAM | 5/25/2007 | | | | |
|
|
|
|