INSP-Final Inspection | 7/28/2008 | 7/28/2008 | 7/28/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Issue permit | | | 11/30/2007 | | DONE |
|
|
|
Entry Made so Permit Can be Finaled
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/6/2007 | | 9/6/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/6/2007 | | DONE |
|
|
|
Left vm for brodie at ###-#### that permit and no fees is ready to be picked up
|
Permit Ready to Issue | | | 9/6/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/22/2007 | | 8/30/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
INSP-Final Inspection | 8/21/2007 | 8/22/2007 | 8/22/2007 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Plan resubmittals received | | | 8/22/2007 | | |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 8/6/2007 | 8/7/2007 | 8/7/2007 | A | PASS |
Troy Cobbley
|
|
|
Hydro tests for the anti-freeze system and the overhead system passed.
|
INSP-Sprinkler Rough-in/Hydro | 8/3/2007 | 8/6/2007 | 8/6/2007 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the locations where the sprinkler piping can be covered. The long branchline located along the north side of the building is now sized at all 2" with a bunch of new pendants. I told Russ that this will have to be resubmitted. This area is not approved for cover especially since there is exposed wood above the ceilings. Per the general contractor the wood will be covered.
|
INSP-Sprinkler Rough-in/Hydro | 7/9/2007 | 7/10/2007 | 7/10/2007 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations where the piping can be covered. The upright heads above the restrooms are overspaced. I went over this with Russ.
|
INSP-Sprinkler Rough-in/Hydro | 6/29/2007 | 6/29/2007 | 6/29/2007 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the locations where the sprinkler piping can be covered. I also spoke with the building contractor about the fire blocking and sprinkler issues in the furred out walls.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/20/2007 | | 6/20/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/20/2007 | | DONE |
|
|
|
|
Telephone call | | | 6/20/2007 | | DONE |
|
|
|
tlk to brodie ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 6/20/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/1/2007 | | 6/19/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Application received | | | 6/1/2007 | | |
|
|
|
|
Pending Assignment by SAM | 6/1/2007 | | | | |
|
|
|
|