INSP-Final Inspection | 9/19/2007 | 9/20/2007 | 9/20/2007 | A | PASS |
Forrest France
|
|
|
Noted items at the previous inspection have been verified for completion, fire sprinkler permit finaled.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/19/2007 | | |
|
|
|
lft ms for ron ###-#### that permit and fees are ready to be picked up
|
Inspection Record Card- Fire | 9/19/2007 | | 9/19/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/19/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/19/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/14/2007 | | 9/18/2007 | | PASS |
|
|
|
Plans & calculations are approved by Bryan Johnson
|
Plan resubmittals received | | | 9/14/2007 | | |
|
|
|
|
Telephone call | | | 9/7/2007 | | DONE |
|
|
|
following email sent to D Hanneman today.
I called the sprinkler contractor (Delta Fire) this morning to ask for a rep to accompany us on a walk-through of the building to evaluate the current status of the sprinkler system.
I spoke with the Branch Manager, Ron, who is also the system designer. He indicated the system is not ready for a final and referred me to the local project foreman, Clarence McLain, for more details.
Clarence indicated: the system is not is service and is not ready for inspection; there are no approved plans at this point; three stairs wells are lacking sprinklers; the wrong temperature heads have been installed throughout the building; Delta has not requested any inspections of the system; Delta's insurance coverage prohibits them from putting the system in service until it has been inspected and approved, including the fire alarm system providing the offsite sprinkler monitoring.
Therefore, Delta will not turn it on, unless the City officially accepts liability for water damage or other types of damage from potential system malfunction.
Delta recently resubmitted revised plans due to numerous field changes and those were denied 9/4/07 for inadequate water pressure and for lack of information on the sprinkler heads. The pressure requirement is a statewide requirement, so the plans should never have been resubmitted showing inadequate pressure. Clarence is aware that the wrong temperature heads were installed throughout the building, as noted on our initial 7/17/07 plan approval review and in our latest 9/4/07 review, and will now have to be replaced. He is also aware of the lack of sprinklers in the stairwells, which he said was due to an architectural change. Adding these heads will necessitate another plan modification.
It does not appear there would be any value in doing a walk through inspection at this time. Let me know if there is anything further, you would like me to do.
Regards,
Sam
|
Case Summary | | | 9/7/2007 | | |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 9/5/2007 | 9/6/2007 | 9/6/2007 | A | PART |
Forrest France
|
|
|
OH hydrostatic test passed. No occupancy is allowed prior to the issuance of a certificate of occupancy for the building per conditon of the issued project permits.
|
INSP-Final Inspection | 9/4/2007 | 9/5/2007 | 9/5/2007 | A | NR |
Forrest France
|
|
|
Project is not ready for inspection, OH was not pressurized for a hydrostatic test at the time of site visit, rescheduled per conversation with contractor, also need to provide approved resubmittals prior to final. NOTE: contacted the general contractor regarding no occupany prior to the issuance of a CO.
|
INSP-Sprinkler Rough-in/Hydro | 8/29/2007 | 8/30/2007 | 8/30/2007 | A | CANC |
Forrest France
|
|
|
Overbooked
|
INSP-Sprinkler Rough-in/Hydro | 8/28/2007 | 8/29/2007 | 8/29/2007 | P | CANC |
Troy Cobbley
|
|
|
Due to the abundance of inspections today there was not adequate time to perform this one. It will need to be rescheduled.
|
Plan resubmittals received | | | 8/23/2007 | | |
|
|
|
received 1 letter of transmittal,1 permit application, 10 fire sprinkler hydraulic calcs, and 5 copys of sheet 1 OF 1 sent to fire
|
INSP-Sprinkler Rough-in | 7/19/2007 | 7/20/2007 | 7/20/2007 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the location where the sprinkler piping can be covered by the hard lids.
|
Issue and Print Permit | | | 7/19/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/18/2007 | | 7/18/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2007 | | |
|
|
|
|
Telephone call | | | 7/18/2007 | | |
|
|
|
left message w/ dave for ron holgrem at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/18/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/11/2007 | | 7/17/2007 | | PASS |
|
|
|
plans & calculations are approved w/conditions as submitted by Bryan Johnson
|
Plan resubmittals received | | | 7/11/2007 | | |
|
|
|
Received application, 4 copies of lateral sway brace calculations, 8 copies of hydraulic calcs, 4 copies of product info, 4 copies of drawing pages FP1 and sheet 1 of 1; taken to fire review
|
Sprinkler Plan Check | | | 6/21/2007 | | FAIL |
|
|
|
Rev'd by BJ
|
Application received | | | 6/5/2007 | | |
|
|
|
|
Pending Assignment by SAM | 6/5/2007 | | | | |
|
|
|
|
Pending Assignment by SAM | 9/14/2007 | | | | |
|
|
|
|