Permit Information
Permit NumberFIR07-00501
StatusFinaled
Name DELTA FIRE SYSTEMS
Site Address 1402 W GROVE ST
Project NameLINEN BUILDING-SHELL
Customer Number 
ePlanReview 
Description
Beginning from the first flange above finished floor, install a wet pipe sprinkler system to serve through out the new 2 story 11,568-ft/2 bldg. The system will be controlled from a wall PIV.
The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD06-00500.09/18/07 Revised Scope of Work:
Bin addition to the original scope, sprinkler coverage was added in both stairwells. High temp heads are approved for use in the Basement only.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/19/20079/20/20079/20/2007APASS
DetailsForrest France
Noted items at the previous inspection have been verified for completion, fire sprinkler permit finaled.
PLANS/APPL TAKEN TO FRONT DESK  9/19/2007 DONE
Telephone call  9/19/2007  
lft ms for ron ###-#### that permit and fees are ready to be picked up
Inspection Record Card- Fire9/19/2007 9/19/2007 DONE
Permit Ready to Issue  9/19/2007 DONE
Issue and Print Permit  9/19/2007 DONE
Sprinkler Plan Check9/14/2007 9/18/2007 PASS
Plans & calculations are approved by Bryan Johnson
Plan resubmittals received  9/14/2007  
Telephone call  9/7/2007 DONE
following email sent to D Hanneman today.
I called the sprinkler contractor (Delta Fire) this morning to ask for a rep to accompany us on a walk-through of the building to evaluate the current status of the sprinkler system.
I spoke with the Branch Manager, Ron, who is also the system designer. He indicated the system is not ready for a final and referred me to the local project foreman, Clarence McLain, for more details.
Clarence indicated: the system is not is service and is not ready for inspection; there are no approved plans at this point; three stairs wells are lacking sprinklers; the wrong temperature heads have been installed throughout the building; Delta has not requested any inspections of the system; Delta's insurance coverage prohibits them from putting the system in service until it has been inspected and approved, including the fire alarm system providing the offsite sprinkler monitoring.
Therefore, Delta will not turn it on, unless the City officially accepts liability for water damage or other types of damage from potential system malfunction.
Delta recently resubmitted revised plans due to numerous field changes and those were denied 9/4/07 for inadequate water pressure and for lack of information on the sprinkler heads. The pressure requirement is a statewide requirement, so the plans should never have been resubmitted showing inadequate pressure. Clarence is aware that the wrong temperature heads were installed throughout the building, as noted on our initial 7/17/07 plan approval review and in our latest 9/4/07 review, and will now have to be replaced. He is also aware of the lack of sprinklers in the stairwells, which he said was due to an architectural change. Adding these heads will necessitate another plan modification.

It does not appear there would be any value in doing a walk through inspection at this time. Let me know if there is anything further, you would like me to do.
Regards,
Sam
Case Summary  9/7/2007  
INSP-Sprinkler Rough-in/Hydro9/5/20079/6/20079/6/2007APART
DetailsForrest France
OH hydrostatic test passed. No occupancy is allowed prior to the issuance of a certificate of occupancy for the building per conditon of the issued project permits.
INSP-Final Inspection9/4/20079/5/20079/5/2007ANR
DetailsForrest France
Project is not ready for inspection, OH was not pressurized for a hydrostatic test at the time of site visit, rescheduled per conversation with contractor, also need to provide approved resubmittals prior to final. NOTE: contacted the general contractor regarding no occupany prior to the issuance of a CO.
INSP-Sprinkler Rough-in/Hydro8/29/20078/30/20078/30/2007ACANC
DetailsForrest France
Overbooked
INSP-Sprinkler Rough-in/Hydro8/28/20078/29/20078/29/2007PCANC
DetailsTroy Cobbley
Due to the abundance of inspections today there was not adequate time to perform this one. It will need to be rescheduled.
Plan resubmittals received  8/23/2007  
received 1 letter of transmittal,1 permit application, 10 fire sprinkler hydraulic calcs, and 5 copys of sheet 1 OF 1 sent to fire
INSP-Sprinkler Rough-in7/19/20077/20/20077/20/2007PPASS
DetailsTroy Cobbley
See the city approved plans for the location where the sprinkler piping can be covered by the hard lids.
Issue and Print Permit  7/19/2007 DONE
Inspection Record Card- Fire7/18/2007 7/18/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/18/2007  
Telephone call  7/18/2007  
left message w/ dave for ron holgrem at ###-#### - permit ready and fees given
Permit Ready to Issue  7/18/2007 DONE
Sprinkler Plan Check7/11/2007 7/17/2007 PASS
plans & calculations are approved w/conditions as submitted by Bryan Johnson
Plan resubmittals received  7/11/2007  
Received application, 4 copies of lateral sway brace calculations, 8 copies of hydraulic calcs, 4 copies of product info, 4 copies of drawing pages FP1 and sheet 1 of 1; taken to fire review
Sprinkler Plan Check  6/21/2007 FAIL
Rev'd by BJ
Application received  6/5/2007  
Pending Assignment by SAM6/5/2007    
Pending Assignment by SAM9/14/2007