INSP-Final Inspection | 9/6/2007 | 9/6/2007 | 9/6/2007 | P | PASS |
Forrest France
|
|
|
Fire sprinkler final inspection passed, permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 7/12/2007 | 7/12/2007 | 7/12/2007 | P | PART |
Forrest France
|
|
|
OH fire sprinkler install is okay for cover at the drop ceilings except where red lined on approved drawings.
|
Issue permit | | | 7/5/2007 | | |
|
|
|
|
Sprinkler Plan Check | 6/8/2007 | | 6/29/2007 | | PASS |
|
|
|
Plans reviewed by Johnson consulting.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/29/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/29/2007 | | 6/29/2007 | | DONE |
|
|
|
|
Telephone call | | | 6/29/2007 | | DONE |
|
|
|
tlk jim danes ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 6/29/2007 | | DONE |
|
|
|
|
Telephone call | | | 6/28/2007 | | DONE |
|
|
|
Matt Kahn called to check on status of his sprinkler plans. Plans were picked up by Johnson Consulting on 6/11/07 and have not been returned to Boise City. Johnson consulting is being contacted by Matt Kahn.
*Update* 6/28/07- Sprinkler plans have not been logged back to Boise City and cannot be accounted for by Johnson consulting. Advised applicant to re-submit application with sprinkler plan via fax to the PDS/Fire for expedited turn around.
|
Case Summary | | | 6/8/2007 | | DONE |
|
|
|
|
Application received | | | 6/8/2007 | | |
|
|
|
|
Pending Assignment by SAM | 6/8/2007 | | | | |
|
|
|
|