Case Summary | | | 7/10/2007 | | |
|
|
|
|
INSP-Final Inspection | 6/21/2007 | 6/22/2007 | 6/22/2007 | A | PASS |
Troy Cobbley
|
|
|
The hood suppression system operated correctly. The air balance is at .025 in the negative and is ok. Two hood are installed with separate manual activation. I found that the hood have been connected to the fire alarm panel prior to having approved drawings. I notified Mike Timmerman. Bar Green is going to install an "eye brow" on the hood since vertical and horizontal distances exceed what is allowed per IMC chapter 507. This will be verified at the building final.
|
INSP-Conference | 6/12/2007 | 6/12/2007 | 6/12/2007 | P | PASS |
Troy Cobbley
|
|
|
I agreed that the placement of the manual pulls for the hood suppression system could be placed at the entrance arch to the west exit door.
|
Application received | | | 6/12/2007 | | |
|
|
|
|
Issue and Print Permit | | | 6/12/2007 | | |
|
|
|
|
Issue and Print Permit | | | 6/12/2007 | | DONE |
|
|
|
|