INSP-Final Inspection | 8/6/2007 | 8/6/2007 | 8/6/2007 | P | PASS |
Forrest France
|
|
|
c/n items verified for completion, fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 8/3/2007 | 8/6/2007 | 8/6/2007 | A | PASS |
Forrest France
|
|
|
OH hydrostatic test completed, inspection passed.
|
INSP-Final Inspection | 8/2/2007 | 8/3/2007 | 8/3/2007 | P | NR |
Forrest France
|
|
|
Need to complete c/n and hydrostatic testing prior to final approval.
|
INSP-Sprinkler Rough-in/Hydro | 8/2/2007 | 8/3/2007 | 8/3/2007 | P | FAIL |
Forrest France
|
|
|
Need one additional EC sw as noted, upright heads at some locations in the studio exceed obstruction tables, need data submittals on vertical sw heads.
|
INSP-Final Inspection | 8/1/2007 | 8/2/2007 | 8/3/2007 | P | NR |
Forrest France
|
|
|
Not ready for final per contractor.
|
INSP-Sprinkler Rough-in | 8/1/2007 | 8/2/2007 | 8/2/2007 | A | NR |
Forrest France
|
|
|
System is not ready for OH hydrostatic test at this time per contractor.
|
Inspection Record Card- Fire | 7/12/2007 | | 7/12/2007 | | DONE |
|
|
|
|
Telephone call | | | 7/12/2007 | | DONE |
|
|
|
tlk to jim heiller ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 7/12/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/12/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/5/2007 | | 7/10/2007 | | PASS |
|
|
|
Plans & calcultations are approved by bryan johnson
|
Sprinkler Plan Check | | | 7/5/2007 | | FAIL |
|
|
|
BJ reviewed, errors in design placard on sheet FP2.
|
Case Summary | | | 6/13/2007 | | DONE |
|
|
|
|
Application received | | | 6/13/2007 | | |
|
|
|
|
Pending Assignment by SAM | 6/13/2007 | | | | |
|
|
|
|