INSP-Final Inspection | 12/27/2007 | 12/31/2007 | 12/31/2007 | A | PASS |
Forrest France
|
|
|
Necessary corrections completed while on site, DCVA to be certified 12/2. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 8/8/2007 | 8/9/2007 | 8/9/2007 | | PASS |
Forrest France
|
|
|
Tenting corrections verified for completion, OH sprinkler piping is approved for cover. Changed to pass- for cover purposes - slr
|
INSP-Sprinkler Rough-in | 8/7/2007 | 8/8/2007 | 8/8/2007 | A | FAIL |
Troy Cobbley
|
|
|
The tenting on the vertical piping in the main entry way is not covered correctly. All other piping can be covered except for this piece until it is inspected.
|
INSP-Sprinkler Rough-in | 8/6/2007 | 8/7/2007 | 8/7/2007 | A | FAIL |
Troy Cobbley
|
|
|
The tenting isn't satifactory and one piece of piping as marked on the plans has been installed as 1" wereas the plans indicate 1 1/4" is to be installed. The riser is too far off of the wall as well and is not completely built yet.
|
Override - Parcel Holds | | | 8/3/2007 | | |
|
|
|
|
Issue and Print Permit | | | 8/3/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2007 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/2/2007 | | |
|
|
|
|
Inspection Record Card- Fire | 8/2/2007 | | 8/2/2007 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/2/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 8/2/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/2/2007 | | DONE |
|
|
|
tlk to lilly ###-#### that permit and fees are ready to be picked up
|
Sprinkler Plan Check | 7/25/2007 | | 7/31/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Plan resubmittals received | | | 7/25/2007 | | |
|
|
|
Received five binders and five copies of pages FP1; taken to fire review
|
Plan resubmittals received | | | 7/17/2007 | | |
|
|
|
Received application and five binders and copies of page FP1; taken to fire review
|
Case Summary | | | 6/14/2007 | | |
|
|
|
|
Application received | | | 6/14/2007 | | |
|
|
|
|
Pending Assignment by SAM | 6/14/2007 | | | | |
|
|
|
|