Final inspection | | | 11/27/2007 | | PASS |
|
|
|
This Entry Was Made To Final This Permit Which Was Finaled by Troy on 8-31-2007
|
INSP-Alarm Testing | 8/30/2007 | 8/31/2007 | 8/31/2007 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Alarm Testing | 8/29/2007 | 8/30/2007 | 8/30/2007 | A | CANC |
Forrest France
|
|
|
Overbooked
|
INSP-Alarm Testing | 8/27/2007 | 8/28/2007 | 8/28/2007 | A | FAIL |
Troy Cobbley
|
|
|
The previous correction notice still stands. The monometer test did not pass.
|
INSP-Alarm Testing | 8/20/2007 | 8/21/2007 | 8/21/2007 | A | FAIL |
Troy Cobbley
|
|
|
Lower the pull station, provide manometer testing for the four units on the roof and the two west units below the deck, drill holes in the roof top duct detector housings and test these four duct smoke detectors.
|
Plan assigned to (Mike) | 6/18/2007 | | 6/28/2007 | | PASS |
|
|
|
6/28/2007 11:20:40 CMC - activity updated through activity FIRA22 from case FIR07-00497.
|
Plan resubmittals received | | | 6/28/2007 | | |
|
|
|
|
Alarm Plan Check | 6/28/2007 | | 6/28/2007 | | PASS |
|
|
|
Fire Alarm Review 2nd
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2007 | | |
|
|
|
Ready for Issue
|
Inspection Record Card- Fire | 6/28/2007 | | 6/28/2007 | | DONE |
|
|
|
|
Telephone call | | | 6/28/2007 | | DONE |
|
|
|
spoke with robert and informed of fees and permit ready
|
Permit Ready to Issue | | | 6/28/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/28/2007 | | DONE |
|
|
|
|
Alarm Plan Check | 6/22/2007 | | 6/22/2007 | | FAIL |
|
|
|
Fire Alarm Review 1st
|
Miscellaneous action | | | 6/22/2007 | | |
|
|
|
Fax Copy of Failed Review to Fire Alarm Applicant - Robert Gobler Sentry Security ###-####
|
Telephone call | | | 6/22/2007 | | |
|
|
|
resubmittal required --gave plans to customer
|
Case Summary | | | 6/18/2007 | | DONE |
|
|
|
|
Application received | | | 6/18/2007 | | |
|
|
|
|