INSP-Final Inspection | 9/12/2007 | 9/13/2007 | 9/13/2007 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 9/11/2007 | 9/12/2007 | 9/12/2007 | A | PART |
Forrest France
|
|
|
OH rough-in and existing fire sprinkler system modifications completed acceptable, final pending field ceiling tile install.
|
INSP-Sprinkler Rough-in | 8/23/2007 | 8/24/2007 | 8/24/2007 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler piping above the hardlids is ok to cover.
|
Issue permit | | | 7/25/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/18/2007 | | 7/18/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/18/2007 | | 7/18/2007 | | DONE |
|
|
|
|
Telephone call | | | 7/18/2007 | | DONE |
|
|
|
tlk to greg johnson ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 7/18/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/20/2007 | | 7/11/2007 | | PASS |
|
|
|
Plans & Calculations are approved as submitted
|
Case Summary | | | 6/20/2007 | | |
|
|
|
|
Application received | | | 6/20/2007 | | |
|
|
|
|
Pending Assignment by SAM | 6/20/2007 | | | | |
|
|
|
|