INSP-Final Inspection | 3/24/2008 | 3/24/2008 | 3/24/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 3/17/2008 | 3/17/2008 | 3/17/2008 | P | PASS |
Troy Cobbley
|
|
|
The overhead piping hydro test passed. The sprinkler piping above the gridded ceilings is ok to cover.
|
(F) Reprint permit | | | 2/25/2008 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/25/2008 | | DONE |
|
|
|
|
Case Summary | | | 2/22/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/15/2008 | | |
|
|
|
|
Telephone call | | | 2/15/2008 | | |
|
|
|
lft vm with sam ball ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 2/15/2008 | | |
|
|
|
|
Inspection Record Card- Fire | 2/15/2008 | | 2/15/2008 | | DONE |
Cathy Brown
|
|
|
|
Sprinkler Plan Check | 2/6/2008 | | 2/13/2008 | | PASS |
|
|
|
These previously approved plans were resubmitted due to changes made in the field during construction. The modification included the addition of 8 heads and other alterations that affected the remote area of operation. A total of 24 heads were affected by this modification. *As-Plans & Calculations are approved by Bryan Johnson
|
Plan resubmittals received | | | 2/6/2008 | | |
|
|
|
received "5" sets of plans with application--plans put on fire shelf
|
INSP-Sprinkler Rough-in | 2/5/2008 | 2/5/2008 | 2/5/2008 | P | PASS |
Troy Cobbley
|
|
|
As-builts need to be provided showing the additional heads. Several heads need tape and foil removed. Provide aux. drain on west end of system as per plans. Provide the correct backflow or provide resubmittals for friction loss verification. Still need to hydro, forward flush and the other finishing touches.
|
INSP-Conference | 11/8/2007 | 11/9/2007 | 11/9/2007 | A | DONE |
Troy Cobbley
|
|
|
I spoke to mike, the superintendant, about the combustible concealed spaces located around the exterior of the building. They are required to be sprinklered per NFPA 4.1 unless the meet one of the exceptions of 8.14
|
FIR-Aging Inspection | 10/16/2007 | 10/16/2007 | 10/16/2007 | | NR |
Troy Cobbley
|
|
|
Work is in progress
|
Issue and Print Permit | | | 7/17/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/13/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/13/2007 | | 7/13/2007 | | DONE |
|
|
|
|
Telephone call | | | 7/13/2007 | | DONE |
|
|
|
lft vm with Sam Ball ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 7/13/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/20/2007 | | 7/12/2007 | | PASS |
|
|
|
Plans are approved by bryan johnson
|
Application received | | | 6/20/2007 | | |
|
|
|
|
Pending Assignment by SAM | 6/20/2007 | | | | |
|
|
|
|