INSP-Final Inspection | 9/14/2007 | 9/17/2007 | 9/17/2007 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 8/1/2007 | 8/2/2007 | 8/3/2007 | P | PART |
Troy Cobbley
|
|
|
The partial drops are passed. Once the tile has been installed the remaining piping will need to be inspected. I also looked at the demo'd piping and hose vavles.
|
Issue and Print Permit | | | 7/16/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/13/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/13/2007 | | 7/13/2007 | | DONE |
|
|
|
|
Telephone call | | | 7/13/2007 | | DONE |
|
|
|
lft ms with brad bettencourt ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 7/13/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/25/2007 | | 7/12/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Application received | | | 6/25/2007 | | |
|
|
|
|