INSP-Final Inspection | 3/11/2008 | 3/12/2008 | 3/12/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 10/31/2007 | 11/1/2007 | 11/1/2007 | A | PART |
Forrest France
|
|
|
24 hr. air test for the preaction system passed, overhead install is approved for cover at the drop ceilings with the exception of two noted locations which will need coverage adjustment-see approved plans for annotations.
|
INSP-Sprinkler Rough-in/Hydro | 10/30/2007 | 10/31/2007 | 10/31/2007 | A | PART |
Forrest France
|
|
|
Begin pneumatic testing of the preaction system at 12:00 @ 46psig.
|
INSP-Sprinkler Rough-in/Hydro | 10/29/2007 | 10/30/2007 | 10/31/2007 | P | PART |
Forrest France
|
|
|
OH hydrostatic test completed for both the wet and preaction systems.
|
CHANGE STATUS TO (ISS) | | | 8/20/2007 | | |
|
|
|
issued previously
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/17/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/17/2007 | | 8/17/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/17/2007 | | DONE |
|
|
|
tlk to jim darrr ###-#### that permit and no fees ready to be picked up
|
Permit Ready to Issue | | | 8/17/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/2/2007 | | 8/16/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Plan resubmittals received | | | 8/2/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/23/2007 | | 7/23/2007 | | DONE |
|
|
|
|
Telephone call | | | 7/23/2007 | | DONE |
|
|
|
tlk to Jim darr ###-#### that permit and fees are ready to be picked up
|
Inspection Record Card- Fire | 7/23/2007 | | 7/23/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/23/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/23/2007 | | |
|
|
|
|
Sprinkler Plan Check | 6/29/2007 | | 7/20/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Application received | | | 6/29/2007 | | |
|
|
|
|
Pending Assignment by SAM | 6/29/2007 | | | | |
|
|
|
|