Case Summary | | | 12/11/2008 | | DONE |
|
|
|
|
INSP-Final Inspection | 12/20/2007 | 12/20/2007 | 12/20/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 11/28/2007 | 11/29/2007 | 11/29/2007 | A | PASS |
Troy Cobbley
|
|
|
OH Hydro passed.
|
INSP-Sprinkler Rough-in/Hydro | 10/30/2007 | 10/31/2007 | 10/31/2007 | A | FAIL |
Troy Cobbley
|
|
|
Overhead hydro failed due to loss of pressure and the fdc not being tested.
|
(F) Reprint permit | | | 10/10/2007 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 10/8/2007 | 10/9/2007 | 10/9/2007 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover. The sprinkler elevations in the patio areas needs addressed.
|
INSP-Supply line flush | 10/3/2007 | 10/4/2007 | 10/4/2007 | A | PASS |
Troy Cobbley
|
|
|
UG Flush passed
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2007 | | |
|
|
|
|
Inspection Record Card- Fire | 9/7/2007 | | 9/7/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/7/2007 | | DONE |
|
|
|
tlk to shawn ramsey ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 9/7/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/7/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/27/2007 | | 9/5/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Plan resubmittals received | | | 7/31/2007 | | DONE |
|
|
|
received 1 application, 5 index for fire protection submittals and 5 plans pages (1,2) taken to fire( Scott A. )
|
Application received | | | 7/3/2007 | | |
|
|
|
|
Pending Assignment by SAM | 7/3/2007 | | | | |
|
|
|
|