INSP-Final Inspection | 9/26/2007 | 9/26/2007 | 9/26/2007 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 9/25/2007 | 9/25/2007 | 9/25/2007 | P | FAIL |
Troy Cobbley
|
|
|
ceiling tiles in store room not put in to do sprinkler final.
|
INSP-Sprinkler Rough-in | 9/17/2007 | 9/17/2007 | 9/17/2007 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping is ok to cover but the fitter needs to add two addition hangers on two armovers that exceed 2' in overall lenght. They will be checked at the final.
|
Sprinkler Plan Check | 7/16/2007 | | 7/16/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/16/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/16/2007 | | 7/16/2007 | | DONE |
|
|
|
|
Telephone call | | | 7/16/2007 | | |
|
|
|
tlk to brodie ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 7/16/2007 | | |
|
|
|
|
Issue and Print Permit | | | 7/16/2007 | | DONE |
|
|
|
|
Application received | | | 7/13/2007 | | |
|
|
|
|
Pending Assignment by SAM | 7/13/2007 | | | | |
|
|
|
|