INSP-Final Inspection | 9/20/2007 | 9/20/2007 | 9/21/2007 | P | PASS |
Forrest France
|
|
|
Resubmittals verified for compliance, final fire sprinkler inspection passed.
|
Issue and Print Permit | | | 9/20/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/19/2007 | | 9/19/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/19/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/19/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/30/2007 | | 9/13/2007 | | PASS |
|
|
|
As built plans are approved
|
Plan resubmittals received | | | 8/30/2007 | | |
|
|
|
received 1 trasnmittal form,1 fire sprinkler application1 remodel cover sheet,1 fire hydraulic cover sheet,6 hydraulic overviews,3 quick response info,and 3 copys of sheet FP-1 sent to fire
|
INSP-Final Inspection | 8/13/2007 | 8/14/2007 | 8/14/2007 | A | FAIL |
Troy Cobbley
|
|
|
The plans do not match the installation and per Chris the fitter as-builts are being submitted. The biggest issue is multiple heads off of 1" outlets. This is not allowed and is stated as such on the review comments in red.
|
Issue and Print Permit | | | 8/13/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/10/2007 | | DONE |
|
|
|
lft vm with tim carve ###-#### that permit and fees are ready to be picked up
|
Override - People Holds | | | 8/10/2007 | | |
|
|
|
|
Inspection Record Card- Fire | 8/10/2007 | | 8/10/2007 | | DONE |
|
|
|
|
Override - People Holds | | | 8/10/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 8/10/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/16/2007 | | 8/8/2007 | | PASS |
|
|
|
Plans are approved w/conditions by Bryan Johnson
|
Application received | | | 7/16/2007 | | |
|
|
|
|
Pending Assignment by SAM | 7/16/2007 | | | | |
|
|
|
|