Case Summary | | | 12/11/2008 | | DONE |
|
|
|
|
INSP-Final Inspection | 12/21/2007 | 12/21/2007 | 12/21/2007 | P | PASS |
Troy Cobbley
|
|
|
Final inspection passed. KR
|
INSP-Supply line flush | 12/21/2007 | 12/21/2007 | 12/21/2007 | P | PART |
Troy Cobbley
|
|
|
Under ground flush passed.KR
|
INSP-Final Inspection | 12/20/2007 | 12/20/2007 | 12/20/2007 | P | NR |
Troy Cobbley
|
|
|
garrett Phone #: ###-####
|
INSP-Supply line flush | 12/20/2007 | 12/20/2007 | 12/20/2007 | P | NR |
Troy Cobbley
|
|
|
garrett Phone #: ###-####
|
INSP-Sprinkler Rough-in | 8/28/2007 | 8/28/2007 | 8/28/2007 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping is ok to cover
|
INSP-Sprinkler Rough-in | 8/24/2007 | 8/24/2007 | 8/24/2007 | P | FAIL |
Troy Cobbley
|
|
|
The sprinkler rough-in is ok but the second floor tenting is not adequate. The locations have been marked on the approved plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/7/2007 | | DONE |
|
|
|
tlk to john edes ###-#### that permit and fees are ready to be picked up
|
Inspection Record Card- Fire | 8/7/2007 | | 8/7/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/7/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/7/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/16/2007 | | 8/5/2007 | | |
|
|
|
Plans are approved w/conditions by bryan johnson
|
Application received | | | 7/16/2007 | | |
|
|
|
|
Pending Assignment by SAM | 7/16/2007 | | | | |
|
|
|
|