INSP-Final Inspection | 9/18/2007 | 9/18/2007 | 9/18/2007 | P | PASS |
Forrest France
|
|
|
Required changes have been completed, some issues repaired while on site, signals verified, fire alarm permit finaled.
|
INSP-Final Inspection | 9/14/2007 | 9/17/2007 | 9/17/2007 | A | FAIL |
Forrest France
|
|
|
The duct detector vent tubes are not installed correctly.
|
INSP-Final Inspection | 9/13/2007 | 9/14/2007 | 9/14/2007 | A | FAIL |
Forrest France
|
|
|
Final pending correct installation of the duct detectors.
|
INSP-Final Inspection | 9/12/2007 | 9/13/2007 | 9/13/2007 | A | PART |
Forrest France
|
|
|
Nac panel, SD at panel, a/v notification devices tested okay, one cd rating corrected while on site, random check of the duct detectors revealed incorrect sample tubes and non-approved locations, final pending acceptable installation and testing of the duct detectors.
|
INSP-Final Inspection | 9/11/2007 | 9/12/2007 | 9/12/2007 | P | CANC |
Forrest France
|
|
|
Overbooked.
|
Issue permit | | | 7/25/2007 | | |
|
|
|
|
Alarm Plan Check | 7/24/2007 | | 7/24/2007 | | PASS |
|
|
|
Fire Alarm Review 1st
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2007 | | |
|
|
|
Ready for Issue
|
Inspection Record Card- Fire | 7/24/2007 | | 7/24/2007 | | DONE |
|
|
|
|
Telephone call | | | 7/24/2007 | | DONE |
|
|
|
spoke w/ kevin and informed of pernit ready and fees
|
Permit Ready to Issue | | | 7/24/2007 | | DONE |
|
|
|
|
Plan assigned to (Mike) | 7/16/2007 | | 7/18/2007 | | PASS |
|
|
|
7/18/2007 13:14:44 CMC - activity updated through activity FIRA22 from case FIR07-00544.
|
Case Summary | | | 7/16/2007 | | DONE |
|
|
|
|
Application received | | | 7/16/2007 | | |
|
|
|
|