INSP-Final Inspection | 10/19/2007 | 10/19/2007 | 10/19/2007 | P | PASS |
Forrest France
|
|
|
Fire alarm work passed per field inspection completed by M. Timmerman, permit finaled.
|
Inspection | 10/19/2007 | 10/19/2007 | 10/19/2007 | P | PASS |
|
|
|
Fire Alarm System Inspection; "Pass" after corrections were made while on site. The tenant space was occupied when I arrived. Called Forrest and Sam, Continued with FA Inspection. Told Contractor that the people were not allowed to occupy the space until a certificate of occupancy was issued. Dave Hanna came to help with the occupancy issue.
|
INSP-Final Inspection | 10/17/2007 | 10/18/2007 | 10/18/2007 | A | CANC |
Troy Cobbley
|
|
|
Overbooked. This will need to be rescheduled.
|
Issue permit | | | 7/30/2007 | | DONE |
|
|
|
|
Plan assigned to (Mike) | 7/19/2007 | | 7/25/2007 | | PASS |
|
|
|
7/25/2007 09:28:55 MWT - activity updated through activity FIRA22 from case FIR07-00628.
|
Alarm Plan Check | 7/25/2007 | | 7/25/2007 | | PASS |
|
|
|
Fire Alarm Review 1st
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2007 | | |
|
|
|
Ready for Issue
|
Inspection Record Card- Fire | 7/25/2007 | | 7/25/2007 | | DONE |
|
|
|
|
Telephone call | | | 7/25/2007 | | DONE |
|
|
|
spoke w/ sandy @ romar electric and informed of permit ready and fees.
|
Permit Ready to Issue | | | 7/25/2007 | | DONE |
|
|
|
|
Case Summary | | | 7/19/2007 | | DONE |
|
|
|
|
Case Summary | | | 7/19/2007 | | |
|
|
|
|
Application received | | | 7/19/2007 | | |
|
|
|
|