INSP-Final Inspection | 1/8/2008 | 1/9/2008 | 1/9/2008 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Alarm Testing | 12/4/2007 | 12/5/2007 | 12/5/2007 | A | FAIL |
Troy Cobbley
|
|
|
All of the a/v's were tested. See the city approved plans for one that did not work and will need replaced and retested. When we started testing the smoke detectors I found that the operation of the smoke detectors in the middle of the corridors did not match the alarm matrix which showed their operation releasing the doors. As programed now only the smoke detectors near the doors are releasing the door hold opens. This would be ok but not all of the smoke detectors are with in 5'-0" of the doors as required. The inspection was stopped until a decision is made on how the smoke detectors are going to function.
|
INSP-Final Inspection | 11/21/2007 | 11/27/2007 | 11/27/2007 | A | CANC |
Troy Cobbley
|
|
|
###-#### - bud Cancelled due to additional strobe being required on the latest plans.
|
CHANGE STATUS TO (ISS) | | | 11/21/2007 | | DONE |
|
|
|
picked up plans
|
(F) Reprint permit | | | 11/21/2007 | | DONE |
|
|
|
|
Alarm Plan Check | 11/20/2007 | | 11/21/2007 | | PASS |
|
|
|
Fire Alarm Review 3rd
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2007 | | |
|
|
|
Ready for Re-Issue
|
Inspection Record Card- Fire | 11/21/2007 | | 11/21/2007 | | DONE |
|
|
|
|
Telephone call | | | 11/21/2007 | | DONE |
|
|
|
tlk with wes smith ###-#### that his permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 11/21/2007 | | DONE |
|
|
|
|
INSP-Final Inspection | 11/16/2007 | 11/20/2007 | 11/20/2007 | A | FAIL |
Troy Cobbley
|
|
|
The electrician stated that his office had contacted mike timmerman and it was ok to provide as-builts for the devices in the added corridor. I called to verify this with mike and he stated he could not recall any such conversation. The corridor appears to be an addition to the scope of work and should be resubmitted. No testing was performed since Ceicil with Kriezenbeck Const. did not want to have to disrupt the hospital twice for the fire alarm test.
|
Plan resubmittals received | | | 11/20/2007 | | |
|
|
|
|
Plan assigned to (Mike) | 11/20/2007 | | 11/20/2007 | | |
|
|
|
Resubmittal required area of work increased, Additional Hallway added to plan.
|
INSP-Final Inspection | 9/25/2007 | 9/26/2007 | 9/26/2007 | A | PART |
Troy Cobbley
|
|
|
The inspection for today covered only the office for the CEO, COO and Receiving. The devices in the offices and immediately outside in the corridor were tested. See the city approved plans for specific devices tested.
|
Issue and Print Permit | | | 8/17/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/15/2007 | | 8/15/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/15/2007 | | DONE |
|
|
|
lft ms with wes smith ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 8/15/2007 | | DONE |
|
|
|
|
Alarm Plan Check | 8/14/2007 | | 8/14/2007 | | PASS |
|
|
|
Fire Alarm Review 2nd
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/14/2007 | | |
|
|
|
Ready for Issue
|
Plan assigned to (Mike) | 7/24/2007 | | 8/14/2007 | | PASS |
|
|
|
8/14/2007 15:17:12 MWT - activity updated through activity FIRA22 from case FIR07-00640.
|
Plan resubmittals received | | | 8/3/2007 | | DONE |
|
|
|
received 2 applications, 2 discriptions of changes & 2 copys of plans with sheets ( E0.0F,E1.0F,E1.1F,E2.0F,E2.1F ) sent to Mike T. in fire
|
Telephone call | | | 7/31/2007 | | DONE |
|
|
|
spoke w/ Wes Smith and informed of resubmittal requirement; will pick up in the afternoon
|
Telephone call | | | 7/31/2007 | | DONE |
|
|
|
gave romar electric the plan for resubmittal
|
Alarm Plan Check | 7/27/2007 | | 7/30/2007 | | FAIL |
|
|
|
Fire Alarm Review 1st
|
Miscellaneous action | | | 7/30/2007 | | |
|
|
|
Fax copy of review to Applicant Wes Smith Romar Electric ###-####.
|
Telephone call | | | 7/30/2007 | | DONE |
|
|
|
left a message for wes smith to return my call
|
Case Summary | | | 7/24/2007 | | DONE |
|
|
|
|
Application received | | | 7/24/2007 | | |
|
|
|
|