INSP-Final Inspection | 11/1/2007 | 11/1/2007 | 11/2/2007 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 10/30/2007 | 10/31/2007 | 10/31/2007 | A | FAIL |
Troy Cobbley
|
|
|
401canopies need to be installed in the restrooms where lights are blocking pendant heads. One head needs to be added at a fixture on the sales floor and two heads are located too close to one another at another fixture on the sales floor. Plans need to be resubmitted to the city of boise due to the amount of added heads caused by the fixtures. The scope of work calls for the air compressor to be changed out which has not been done yet.
|
INSP-Sprinkler Rough-in | 10/17/2007 | 10/18/2007 | 10/18/2007 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler piping in areas 16, 17 & 18 is ok to cover.
|
INSP-Sprinkler Rough-in | 10/15/2007 | 10/16/2007 | 10/16/2007 | P | PASS |
Troy Cobbley
|
|
|
Sales floor - areas 12 & 13 are ok to cover
|
INSP-Sprinkler Rough-in | 9/27/2007 | 9/28/2007 | 9/28/2007 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for areas marked with todays date that are ok for cover.
|
INSP-Sprinkler Rough-in | 9/11/2007 | 9/12/2007 | 9/12/2007 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for piping in the womens clothing area that is ok to cover.
|
INSP-Sprinkler Rough-in | 9/7/2007 | 9/10/2007 | 9/10/2007 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was for the men's restroom but the fire sprinkler contractor did not have the approved plans. We went to the bakery and I showed him the overspaced heads there.
|
INSP-Sprinkler Rough-in | 8/30/2007 | 8/31/2007 | 8/31/2007 | A | PASS |
Troy Cobbley
|
|
|
This rough to cover is for areas 7&8. Piping is ok to cover. See the city approved plans for the location with todays date.
|
INSP-Sprinkler Rough-in | 8/29/2007 | 8/30/2007 | 8/30/2007 | A | CANC |
Forrest France
|
|
|
Overbooked
|
INSP-Sprinkler Rough-in | 8/22/2007 | 8/23/2007 | 8/23/2007 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations where the piping is ok to cover marked with todays date.
|
INSP-Final Inspection | 8/15/2007 | 8/16/2007 | 8/16/2007 | A | FAIL |
Troy Cobbley
|
|
|
This inspection was just for the electronics area and for part of the womens clothing department. See the city approved plans for the exact locations.
|
INSP-Final Inspection | 8/15/2007 | 8/15/2007 | 8/15/2007 | P | CANC |
Troy Cobbley
|
|
|
Duplicate inspection. See previous entry.
|
INSP-Sprinkler Rough-in | 8/15/2007 | 8/15/2007 | 8/15/2007 | P | FAIL |
Troy Cobbley
|
|
|
This inspection was for the electronics area only. I found six missing sprinkler heads. See the city approved fire sprinkler plans for locations.
|
Telephone call | | | 8/15/2007 | | DONE |
|
|
|
Plans have been issued; per telcons with Jeff Diehl and Troy Cobbley the runner has not arrived with the plans yet. I called the Shilo contact shown under "people" and requested he call in and schedule the inspection they are waiting to do; he confirmed the runner is enroute with the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/15/2007 | | 8/15/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/15/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/15/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/14/2007 | | DONE |
|
|
|
Telcon with Jeffery Diehl, ESI Const. He indicated the remodeled Electronics and Sales Areas are barricaded off to keep public out and the sprinklers in these areas were modified under the Early Start permit and are now competed, in-service and ready for final inspection. He requested approval to stock the fixtures with merchandise tonight and to open to public tomorrow. Subsequent telcons with Dave Hanneman and Bryan Johnson, and discussions with J. Gilliland and Dan Stuart, regarding background and expediting sprinkler plan review. I gave approval for the storage fixtures to be stocked with merchandise but no public occupancy is allowed until the sprinklers and building/fire life safety inspections are satisfactorily completed and signed off. Sprinkler plan review is expected to be completed tonight and permit should be ready to issue tomorrow morning and we will inspect immediately; I advised Troy to expect a reinspection request for tomorrow about 11:00am. Mr. Diehl said they had already spoken with the building inspector about doing an inspection of those areas only, for "partial" approval to occupy (i.e. open to public) these two spaces. The remainder of the TI and garden addition areas will be completed later.
|
Pending Assignment by SAM | 7/25/2007 | | 8/14/2007 | | PASS |
|
|
|
Plans are approved w/conditions by Bryan Johnson
|
Application received | | | 7/25/2007 | | |
|
|
|
|
Case Summary | | | 7/25/2007 | | DONE |
|
|
|
|
Miscellaneous action | | | 7/25/2007 | | DONE |
|
|
|
Early Start request approved. See Attached Doc's.
|
Pending Assignment by SAM | 7/25/2007 | | | | |
|
|
|
|