Case Summary | | | 5/14/2008 | | DONE |
|
|
|
|
Case Summary | | | 5/13/2008 | | DONE |
|
|
|
|
INSP-Final Inspection | 8/15/2007 | 8/16/2007 | 8/16/2007 | A | PASS |
Troy Cobbley
|
|
|
Permit is finaled
|
INSP-Sprinkler Rough-in | 8/15/2007 | 8/15/2007 | 8/15/2007 | P | CANC |
Troy Cobbley
|
|
|
This inspection was taken care of yesterday.
|
INSP-Sprinkler Rough-in | 8/9/2007 | 8/14/2007 | 8/14/2007 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler piping is ok to cover. This inspection took two trips due to the first inspection I found the hanger attachments not correct. They have been corrected on the second inspection of the day.
|
Sprinkler Plan Check | 7/26/2007 | | 7/26/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/26/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/26/2007 | | 7/26/2007 | | DONE |
|
|
|
|
Telephone call | | | 7/26/2007 | | DONE |
|
|
|
spoke w/lillie and informed of permit ready and fees.
|
Permit Ready to Issue | | | 7/26/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/26/2007 | | DONE |
|
|
|
|
Application received | | | 7/25/2007 | | |
|
|
|
|
Pending Assignment by SAM | 7/25/2007 | | | | |
|
|
|
|