INSP-Final Inspection | 8/15/2007 | 8/15/2007 | 8/15/2007 | P | PASS |
Forrest France
|
|
|
Final fire sprinkler inspection passed, permit finaled.
|
INSP-Final Inspection | 8/14/2007 | 8/14/2007 | 8/14/2007 | P | PART |
Forrest France
|
|
|
Resubmittals match field modifications and installation which was conditionaly approved for cover on 7/27, missing hangers have been added on end branch lines as required. Permit final pending item # 2 on review notes regarding hydraluic calculations for verification of system design exceeding more than one head off 1" branch line piping.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/13/2007 | | 8/13/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/13/2007 | | DONE |
|
|
|
lft vm with thomas housholder ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 8/13/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/13/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/30/2007 | | 8/10/2007 | | PASS |
|
|
|
Plans are approved w/conditions by Bryan Johnson
|
Telephone call | | | 8/1/2007 | | DONE |
|
|
|
telcon from Kirt, at Wenzel construction re status of plans resubmitted 7/30, and requesting that F.France sign off for occupancy without approved sprinkler plans. I spoke with Forrest; he indicate approximately 40 heads were affected by the plan modification; he approved for cover on 7/27 but it exceeds our policy for field plan reviews of plan modifications. I agreed him and called back Kirt and explained why this needs a plan review and that it will be Monday before plans are reviewed, as 5 days is our current turnaround for resubmittals due to the back log of first submittals of over 10 days.
|
Case Summary | | | 7/30/2007 | | |
|
|
|
|
Application received | | | 7/30/2007 | | |
|
|
|
|
Pending Assignment by SAM | 7/30/2007 | | | | |
|
|
|
|