INSP-Final Inspection | 11/28/2007 | 11/28/2007 | 11/28/2007 | A | PASS |
Forrest France
|
|
|
Final inspection passed, field modifications are approved, permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 11/8/2007 | 11/8/2007 | 11/8/2007 | P | PART |
Forrest France
|
|
|
Work completed is outside this permit scope, notified contractor to obtain a quick permit for the six relcoated heads at the first floor hallway.
|
INSP-Sprinkler Rough-in/Hydro | 10/1/2007 | 10/1/2007 | 10/1/2007 | A | PART |
Forrest France
|
|
|
Overhead install is acceptable, need as-built plans showing field modifications at the escalator.
|
Issue and Print Permit | | | 8/20/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/17/2007 | | |
|
|
|
|
Inspection Record Card- Fire | 8/17/2007 | | 8/17/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/17/2007 | | DONE |
|
|
|
tlk with tom ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 8/17/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/31/2007 | | 8/15/2007 | | PASS |
|
|
|
Plans are approved as submitted by bryan johson
|
Application received | | | 7/31/2007 | | |
|
|
|
|
Pending Assignment by SAM | 7/31/2007 | | | | |
|
|
|
|