INSP-Final Inspection | 9/21/2007 | 9/21/2007 | 9/21/2007 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 8/20/2007 | 8/20/2007 | 8/20/2007 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 8/20/2007 | 8/20/2007 | 8/20/2007 | A | PART |
Forrest France
|
|
|
Fire sprinkler modifications are acceptable.
|
INSP-Sprinkler Rough-in/Hydro | 8/17/2007 | 8/17/2007 | 8/17/2007 | P | DEFR |
Forrest France
|
|
|
Rescheduled per conversation with contractor.
|
Issue and Print Permit | | | 8/6/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/3/2007 | | 8/3/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/3/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/3/2007 | | 8/3/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/3/2007 | | |
|
|
|
tlk to tom dutkus ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 8/3/2007 | | DONE |
|
|
|
|
Application received | | | 8/2/2007 | | |
|
|
|
|
Pending Assignment by SAM | 8/2/2007 | | | | |
|
|
|
|