INSP-Final Inspection | 4/18/2008 | 4/18/2008 | 4/18/2008 | P | PASS |
Forrest France
|
|
|
Corrections are complete, fire sprinkler permit finaled.
|
INSP-Final Inspection | 9/20/2007 | 9/21/2007 | 9/21/2007 | P | PART |
Forrest France
|
|
|
Annual inspection is complete, still missing ceiling tile at several locations-need to install prior to final.
|
INSP-Final Inspection | 9/19/2007 | 9/19/2007 | 9/20/2007 | P | FAIL |
Forrest France
|
|
|
Missing ceiling tile at several locations, also overdue on a current annual inspection at the existing system riser-last tagged date is 1999.
|
INSP-Sprinkler Rough-in | 9/10/2007 | 9/10/2007 | 9/10/2007 | P | PART |
Forrest France
|
|
|
OH fire sprinkler modifications are approved for cover at the drop ceilings, noted overdue annual inspection for the existing sprinkler system will need to be completed prior to final, permit final also pending ceiling tile and escutcheons.
|
Issue and Print Permit | | | 8/9/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/8/2007 | | 8/8/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/8/2007 | | 8/8/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/8/2007 | | DONE |
|
|
|
lft vm with brad bettencourt ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 8/8/2007 | | |
|
|
|
|
Application received | | | 8/7/2007 | | |
|
|
|
|
Pending Assignment by SAM | 8/7/2007 | | | | |
|
|
|
|