INSP-Final Inspection | 9/27/2007 | 9/27/2007 | 9/27/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 9/18/2007 | 9/18/2007 | 9/19/2007 | P | FAIL |
Forrest France
|
|
|
New upright heads are overspaced at the open work area, overhead install at the drop ceilings is approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 9/11/2007 | 9/12/2007 | 9/12/2007 | A | PART |
Forrest France
|
|
|
Red lines on approved plans indicate rooms and areas okay for drop ceiling cover.
|
Inspection Record Card- Fire | 8/21/2007 | | 8/21/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/21/2007 | | DONE |
|
|
|
tlk to brodie ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 8/21/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/21/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/20/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/20/2007 | | 8/17/2007 | | PASS |
|
|
|
Plans are approved as submitted by Bryan Johnson
|
Application received | | | 8/7/2007 | | |
|
|
|
|
Pending Assignment by SAM | 8/7/2007 | | | | |
|
|
|
|