INSP-Final Inspection | 11/9/2007 | 11/9/2007 | 11/9/2007 | A | PASS |
Forrest France
|
|
|
Complete foward flush,Test flow switch tamper switch and bell.Test connection to alarm panel.KR
|
INSP-Final Inspection | 11/8/2007 | 11/8/2007 | 11/8/2007 | P | PART |
Forrest France
|
|
|
OH rough-in inspection passed, noted overhead door is located opposite from what is indicated on approved plan set.
|
Sprinkler Plan Check | 11/7/2007 | | 11/7/2007 | | PASS |
|
|
|
Plan modification submittal canceled and permit returned to Issued Status, based on telcon from Brooke, Commercial Fire. The Applicant requested we cancel the as-built plans and they will install in accordance with the previously issued plans. We will log that action in tidemark and change the permit back to ISS status and bill them the minimum Plan Modification review fee of $150
|
CHANGE STATUS TO (ISS) | | | 11/7/2007 | | DONE |
|
|
|
See notes in fire plan activity or any questions please call Sam R.
|
Plan resubmittals received | | | 10/16/2007 | | |
|
|
|
Received modification/as builts. Received three copies of application, hydraulic calcs, United Water flow sheet, product info and page FP-1; taken to fire review
|
Issue and Print Permit | | | 10/12/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/9/2007 | | |
|
|
|
lft ms with voice system brook ###-#### that permit and fees are ready to be picked up
|
Inspection Record Card- Fire | 10/9/2007 | | 10/9/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/9/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/26/2007 | | 10/2/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Plan resubmittals received | | | 9/26/2007 | | |
|
|
|
Received three copies of application and submittal packets, FP-1 and cut sheets; taken to fire review
|
Miscellaneous action | | | 9/5/2007 | | DONE |
|
|
|
Approved Early Start request. Copy attached.
|
Plan resubmittals received | | | 8/31/2007 | | |
|
|
|
received "3" sets of revisions (35) pages & "3" sheets of FP-1--plans taken to Scott Arellano
|
Case Summary | | | 8/10/2007 | | DONE |
|
|
|
|
Application received | | | 8/10/2007 | | |
|
|
|
|
Pending Assignment by SAM | 8/10/2007 | | | | |
|
|
|
|
Plan assigned to (SAM) | 10/16/2007 | | | | |
|
|
|
|
Sprinkler Plan Check | 10/16/2007 | | | | FAIL |
|
|
|
These plans were denied for the following reasons but are not limited to just these reasons as a complete review of the plans and calculations could not be performed. Note this was a plan modification of a previously approved plan.
* The friction loss for a 4” Wilkins 350 flowing 696.9 gpm is 10 psi. Taking this into consideration, this system will not achieve the minimum requirement of 5% remaining supply. In-fact the system will be around -2.5 lb below the 0 mark. Please revise the plans and resubmit ASAP.
Upon request the denied set of plan may be retrieved from my office for salvage. Plans will be maintained for 5 business days.
|