INSP-Final Inspection | 6/3/2008 | 6/4/2008 | 6/4/2008 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 6/2/2008 | 6/3/2008 | 6/3/2008 | A | DEFR |
Forrest France
|
|
|
cole Phone #: ###-####
|
INSP-Final Inspection | 5/27/2008 | 5/28/2008 | 5/28/2008 | A | PART |
Forrest France
|
|
|
Previous c/n items are finished, rough-in approved for cover as red lined on plans.
|
INSP-Sprinkler Rough-in | 5/23/2008 | 5/27/2008 | 5/27/2008 | A | FAIL |
Forrest France
|
|
|
Inspection for cover failed at four locations-see plan set for annotations including missing coverage at one storage room, blocked pendent at a patient room by an adjacent curtain track, one overspaced hanger at the corridor, one head to be relocated due to blockage by a cabinet, mc cable is not to be attatched to sprinkler hanger rods-removed while on site, remainder of ceilings are okay for cover as initialed with today's date.
|
INSP-Sprinkler Rough-in | 5/22/2008 | 5/23/2008 | 5/23/2008 | A | PART |
Forrest France
|
|
|
See approved plans for areas okayed to date.
|
INSP-Sprinkler Rough-in | 5/21/2008 | 5/22/2008 | 5/22/2008 | A | PART |
Forrest France
|
|
|
See areas red-lined on plan set for ceiling cover approved, field tile is not to be installed prior to rough-in inspection at the remainder of project remodel.
|
INSP-Sprinkler Rough-in | 5/20/2008 | 5/20/2008 | 5/20/2008 | P | FAIL |
Troy Cobbley
|
|
|
Almost all of the ceiling tile has been installed prior to a rough-in inspection. I let Cole know that the ceiling tile needs to come back out. Only the areas as marked on the approved plans were ok to cover. No inspection performed.
|
INSP-Sprinkler Rough-in | 1/31/2008 | 1/31/2008 | 1/31/2008 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the two rooms that were approved for cover today.
|
INSP-Sprinkler Rough-in | 1/25/2008 | 1/28/2008 | 1/28/2008 | A | PART |
Forrest France
|
|
|
Refer to annotations on plans for areas where the overhead rough-in can be covered at the drop and hard lid ceilings.
|
INSP-Sprinkler Rough-in | 12/28/2007 | 12/31/2007 | 12/31/2007 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler work at four hard lid ceiling areas as initialed and dated on plan set are okay for cover.
|
INSP-Sprinkler Rough-in/Hydro | 11/26/2007 | 11/27/2007 | 11/27/2007 | A | PART |
Forrest France
|
|
|
See stamped plans for rooms initialed as approved for cover.
|
INSP-Sprinkler Rough-in | 10/30/2007 | 10/31/2007 | 10/31/2007 | A | PART |
Forrest France
|
|
|
See areas noted on approved plans okay for cover at the hard lids including soffits and restrooms.
|
Plan assigned to (SAM) | 9/19/2007 | | 10/3/2007 | | PASS |
|
|
|
10/3/2007 11:13:57 P_S - activity updated through activity FIRA22 from case FIR07-00702.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/3/2007 | | 10/3/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/3/2007 | | DONE |
|
|
|
left vm for brodie at ###-#### - permit ready and no fees due
|
Permit Ready to Issue | | | 10/3/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/3/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/19/2007 | | 10/1/2007 | | PASS |
|
|
|
plans are approved as submitted by bryan johnson
|
Plan resubmittals received | | | 9/19/2007 | | |
|
|
|
Received five copies of application, product info, and page FP-1; taken to fire review
|
Telephone call | | | 9/12/2007 | | DONE |
|
|
|
lft vm with brodie ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 9/12/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/12/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/10/2007 | | 8/24/2007 | | PASS |
|
|
|
Plans are approved by bryan johnson
|
Sprinkler Plan Check | 8/10/2007 | | 8/24/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Application received | | | 8/10/2007 | | |
|
|
|
|
Pending Assignment by SAM | 8/10/2007 | | | | |
|
|
|
|