INSP-Final Inspection | 1/8/2008 | 1/9/2008 | 1/9/2008 | P | PASS |
Troy Cobbley
|
|
|
Corrections made per Troys notes. KR
|
INSP-Final Inspection | 1/7/2008 | 1/8/2008 | 1/8/2008 | P | FAIL |
Troy Cobbley
|
|
|
The riser needs to be located within 1 1/2" of the wall as per the installation guide. Alarm interconnection needs to be tested. Underground flush is passed.
|
INSP-Final Inspection | 1/3/2008 | 1/4/2008 | 1/4/2008 | A | CANC |
Troy Cobbley
|
|
|
Per sam the project is not ready for final.
|
Override - Parcel Holds | | | 10/4/2007 | | |
|
|
|
|
Issue and Print Permit | | | 10/4/2007 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 10/3/2007 | | |
|
|
|
|
Inspection Record Card- Fire | 10/3/2007 | | 10/3/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/3/2007 | | DONE |
|
|
|
t/c w greg johnson at ###-#### permit ready and no fees due
|
Override - Parcel Holds | | | 10/3/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 10/3/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2007 | | |
|
|
|
|
Sprinkler Plan Check | 9/14/2007 | | 9/28/2007 | | PASS |
|
|
|
plans are approved as submitted by bryan johnson
|
INSP-Sprinkler Rough-in | 9/14/2007 | 9/14/2007 | 9/14/2007 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover
|
Override - Parcel Holds | 9/14/2007 | 1/1/1900 | 9/14/2007 | | |
|
|
|
not dealing with framing
|
Plan resubmittals received | | | 9/14/2007 | | |
|
|
|
received 5 fire sprinklerapplication,5 united water sheet,5 fire sprinkler cover sheet, 5 book lets of hydraulic calcs and 5 copys of sheets 1 of 2 , 2 of 2 sent to fire ( this permit was issued 9-6-07)
|
INSP-Sprinkler Rough-in | 9/12/2007 | 9/13/2007 | 9/13/2007 | P | PART |
Troy Cobbley
|
|
|
The sprinkler rough-in is ok but the tenting is not done yet. The sprinkler piping can not be covered yet. Plans need to be resubmitted since a sprinkler head has been added in the single head calc area. It appears this area is now the new two head remote area.
|
Override - Parcel Holds | 9/12/2007 | 1/1/1900 | 9/12/2007 | | |
|
|
|
IRE
|
Override - Parcel Holds | | | 9/6/2007 | | |
|
|
|
|
Issue and Print Permit | | | 9/6/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/5/2007 | | DONE |
|
|
|
t/c w greg johnson at ###-#### - permit ready and fees given
|
Override - Parcel Holds | | | 9/5/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 9/5/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/15/2007 | | 9/4/2007 | | DONE |
|
|
|
plans are approved as submitted by bryan johnson
|
Override - Parcel Holds | | | 9/4/2007 | | |
|
|
|
|
Inspection Record Card- Fire | 9/4/2007 | | 9/4/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2007 | | DONE |
|
|
|
|
Application received | | | 8/15/2007 | | |
|
|
|
|
Pending Assignment by SAM | 8/15/2007 | | | | |
|
|
|
|