INSP-Final Inspection | 10/16/2007 | 10/17/2007 | 10/17/2007 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. The sprig ups into the overbuild areas are complete and match plans including the wire seismic supports. The insulation is at the roof deck. Forward flush of the backflow preventor passed.
|
INSP-Sprinkler Rough-in/Hydro | 9/19/2007 | 9/20/2007 | 9/20/2007 | A | PART |
Forrest France
|
|
|
Overhead rough-in is acceptable, no access provided to a janitors room-will verifiy at next visit, noted a hydrostatic test for this portion of the building has been completed,
|
INSP-Sprinkler Rough-in | 9/19/2007 | 9/19/2007 | 9/19/2007 | P | CANC |
Forrest France
|
|
|
terry ###-#### Inspection cancelled from web by: John Warnick
|
Telephone call | | | 9/19/2007 | | DONE |
|
|
|
john at commercial fire ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 9/19/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/19/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/11/2007 | | 9/18/2007 | | PASS |
|
|
|
plans are approved as submitted by bryan johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2007 | | |
|
|
|
|
Inspection Record Card- Fire | 9/18/2007 | | 9/18/2007 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/11/2007 | | |
|
|
|
received "3" sets of calculations including the app. (32) pages & "3" sheets of FP-1- plans put on shelf for plan reviewer
|
Application received | | | 8/17/2007 | | |
|
|
|
|
Pending Assignment by SAM | 8/17/2007 | | | | |
|
|
|
|