Plan resubmittals received | | | 9/11/2007 | | DONE |
|
|
|
As-Built drawings recieved
|
INSP-Final Inspection | 8/28/2007 | 8/29/2007 | 8/29/2007 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Supply line flush | 8/27/2007 | 8/28/2007 | 8/28/2007 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed.
|
INSP-Sprinkler Rough-in | 8/27/2007 | 8/27/2007 | 8/27/2007 | P | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed.
|
INSP-Sprinkler Rough-in | 8/22/2007 | 8/23/2007 | 8/23/2007 | A | PASS |
Troy Cobbley
|
|
|
The underground supply piping is ok to cover. An as-built was provided for the routing changes.
|
Sprinkler Plan Check | 8/20/2007 | | 8/20/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/20/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/20/2007 | | 8/20/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/20/2007 | | DONE |
|
|
|
lft ms with receptionist for brad bettencourt that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 8/20/2007 | | |
|
|
|
|
Issue and Print Permit | | | 8/20/2007 | | DONE |
|
|
|
|
Application received | | | 8/17/2007 | | |
|
|
|
|
Pending Assignment by SAM | 8/17/2007 | | | | |
|
|
|
|