INSP-Final Inspection | 12/31/2007 | 12/31/2007 | 12/31/2007 | P | PASS |
Forrest France
|
|
|
Items on c/n have been provided, fire sprinkler permit finaled.
|
INSP-Final Inspection | 12/21/2007 | 12/21/2007 | 12/21/2007 | P | FAIL |
Troy Cobbley
|
|
|
Need to test flow switch/bell. Provide signage and stickers at riser. Certify backflow.
|
Override - Parcel Holds | 12/21/2007 | 1/1/1900 | 12/21/2007 | | |
|
|
|
Not applicable to this inspection
|
Override - Parcel Holds | | | 10/31/2007 | | |
|
|
|
|
Issue and Print Permit | | | 10/31/2007 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 10/18/2007 | | 10/30/2007 | | PASS |
|
|
|
10/30/2007 10:45:52 CMC - activity updated through activity FIRA22 from case FIR07-00722.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/30/2007 | | DONE |
|
|
|
tlk to secretary for ben chavez ###-#### that permit and fees are ready to be picked up
|
Override - Parcel Holds | | | 10/30/2007 | | |
|
|
|
|
Inspection Record Card- Fire | 10/30/2007 | | 10/30/2007 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 10/30/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 10/30/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/18/2007 | | 10/25/2007 | | PASS |
|
|
|
As built Plans & Calculation are approved by Bryan Johnson
|
Plan resubmittals received | | | 10/18/2007 | | |
|
|
|
received fire spr app, & "3" sets of fire protection submittals & "3" sets of plans with 2 sheets each of FP1 of 2 & FP2 of 2--plans put on fire shelf
|
INSP-Supply line flush | 10/16/2007 | 10/16/2007 | 10/16/2007 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed.
|
Override - Parcel Holds | 10/16/2007 | 1/1/1900 | 10/16/2007 | | |
|
|
|
rough in done on 9-14-07
|
INSP-Sprinkler Rough-in | 9/13/2007 | 9/14/2007 | 9/14/2007 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover
|
Override - Parcel Holds | 9/13/2007 | 1/1/1900 | 9/13/2007 | | |
|
|
|
fire sprinkler r/i
|
INSP-Sprinkler Rough-in/Hydro | 9/6/2007 | 9/7/2007 | 9/7/2007 | P | FAIL |
Troy Cobbley
|
|
|
The rough-in of the piping as installed is ok. As-built plans will be required due to the additional sprinkler heads added. No "ok" to cover was given due to the owners may decide to utilize a anti-freeze system instead of tenting the piping. As of today the piping in the unheated areas has not been tented.
|
Override - Parcel Holds | 9/6/2007 | 1/1/1900 | 9/6/2007 | | |
|
|
|
fire
|
Telephone call | | | 9/5/2007 | | DONE |
|
|
|
left message w laura for ben chavez at ###-#### - permit ready and fees given
|
Override - Parcel Holds | | | 9/5/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 9/5/2007 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/5/2007 | | |
|
|
|
|
Issue and Print Permit | | | 9/5/2007 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/4/2007 | | |
|
|
|
|
Inspection Record Card- Fire | 9/4/2007 | | 9/4/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/20/2007 | | 8/28/2007 | | PASS |
|
|
|
plans are approved as submitted by bryan johnson
|
Application received | | | 8/20/2007 | | |
|
|
|
|
Pending Assignment by SAM | 8/20/2007 | | | | |
|
|
|
|