Permit Information
Permit NumberFIR07-00722
StatusFinaled
Name UNITED FIRE PROTECTION LLC
Site Address 4298 N FOREST MEADOW AVE
Project Name 
Customer Number 
ePlanReview 
Description
Scope of Work - Beginning from the supply side of the Back Flow Device, (Supplied By Others) To install a life safety NFPA 13D system in a new two story with a basement, single family dwelling of 4,556-ft/2. Additional coverage was added beneath the Bonus room. System shall be equipped with an alarm initiating device and an outside alarm. All fire sprinkler work and related, which includes dual use, single service water supply, the system backflow prevention device (provided by others), shall be per IFC2003 903, NFPA 13D, approved plans, engineering/red-lining and attached review comments, under direction of the Fire Chief. This permit is attached to: BLD07-01041.10/25/07 Fire Sprinkler System Design/Spacing: Most Demanding
Residential Remote 2nd floor Remote Test Area 3 Master Bath Hallway (Operating a minimum of 2 sprinklers) – Sheet FP-2, provided with:
TYCO Mod LFII, 4.9 K-factor, (½”), TY3596.
Calculated for a maximum: 18’ X 18’ spacing.
Each head requires a minimum 17.0gpm @ 12.04 psi.
System has a cushion with 19.28 psi remaining at the base of the riser (Node #1).
Total System Requirements: 34.38 gpm @ 57.11 psi from the base of riser.
These automatic sprinklers have ½" threads and a 4.9 K-factor orifice. The sprinkler temperature ratings are 155ºF (Red 3mm Bulb), ordinary temperature, allowing for a maximum 100ºF ambient ceiling temperature.
Elevation of the highest sprinkler in the remote in relation to the node 1 test (connection at the domestic United Water tap) is 23’-6” feet.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/31/200712/31/200712/31/2007PPASS
DetailsForrest France
Items on c/n have been provided, fire sprinkler permit finaled.
INSP-Final Inspection12/21/200712/21/200712/21/2007PFAIL
DetailsTroy Cobbley
Need to test flow switch/bell. Provide signage and stickers at riser. Certify backflow.
Override - Parcel Holds12/21/20071/1/190012/21/2007  
Not applicable to this inspection
Override - Parcel Holds  10/31/2007  
Issue and Print Permit  10/31/2007 DONE
Plan assigned to (SAM)10/18/2007 10/30/2007 PASS
10/30/2007 10:45:52 CMC - activity updated through activity FIRA22 from case FIR07-00722.
PLANS/APPL TAKEN TO FRONT DESK  10/30/2007 DONE
Telephone call  10/30/2007 DONE
tlk to secretary for ben chavez ###-#### that permit and fees are ready to be picked up
Override - Parcel Holds  10/30/2007  
Inspection Record Card- Fire10/30/2007 10/30/2007 DONE
Override - Parcel Holds  10/30/2007  
Permit Ready to Issue  10/30/2007 DONE
Sprinkler Plan Check10/18/2007 10/25/2007 PASS
As built Plans & Calculation are approved by Bryan Johnson
Plan resubmittals received  10/18/2007  
received fire spr app, & "3" sets of fire protection submittals & "3" sets of plans with 2 sheets each of FP1 of 2 & FP2 of 2--plans put on fire shelf
INSP-Supply line flush10/16/200710/16/200710/16/2007PPASS
DetailsTroy Cobbley
Underground supply line flush passed.
Override - Parcel Holds10/16/20071/1/190010/16/2007  
rough in done on 9-14-07
INSP-Sprinkler Rough-in9/13/20079/14/20079/14/2007APASS
DetailsTroy Cobbley
Sprinkler piping is ok to cover
Override - Parcel Holds9/13/20071/1/19009/13/2007  
fire sprinkler r/i
INSP-Sprinkler Rough-in/Hydro9/6/20079/7/20079/7/2007PFAIL
DetailsTroy Cobbley
The rough-in of the piping as installed is ok. As-built plans will be required due to the additional sprinkler heads added. No "ok" to cover was given due to the owners may decide to utilize a anti-freeze system instead of tenting the piping. As of today the piping in the unheated areas has not been tented.
Override - Parcel Holds9/6/20071/1/19009/6/2007  
fire
Telephone call  9/5/2007 DONE
left message w laura for ben chavez at ###-#### - permit ready and fees given
Override - Parcel Holds  9/5/2007  
Permit Ready to Issue  9/5/2007 DONE
Override - Parcel Holds  9/5/2007  
Issue and Print Permit  9/5/2007 DONE
Override - Parcel Holds  9/4/2007  
Inspection Record Card- Fire9/4/2007 9/4/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/4/2007 DONE
Sprinkler Plan Check8/20/2007 8/28/2007 PASS
plans are approved as submitted by bryan johnson
Application received  8/20/2007  
Pending Assignment by SAM8/20/2007