This permit is to install a supplemental fire suppression and pre-action sprinkler control system at the Time Warner tenant improvement project. Work includes installation of a fire suppression system (clean agent) associated smoke and heat detection, abort stations and release modules, agent release warning and discharge notification devices and pre-action sprinkler system control and visual fire alarm notification. Building permit # BLD07-01422 is to remodel an existing concrete tilt up building constructed under BLD 05-01992. Exterior work includes the removal and demo of the following: An accessible ramp, one exterior door, landing, stairs, and sidewalk within the south facing wall. New work at the exterior shall include the following: The installation of a pad and concrete walls to conceal an emergency generator. Replace a single exterior door with a new double door. Install one new exterior door, within the east facing wall, and includes the installation of new landings and sidewalks for this door. The interior work shall consist of finishing the interior of this 10,000 square feet building, Constructing a wall to divide the office area from the warehouse area. The office area is 4,500 square feet; within this area construction of two accessible restrooms shall be provided. The remainder of this building will be divided into three separate areas for storage, equipment and future expansion. This area shall include the construction of an accessible restroom with a shower. Additional work accompanying this permit but separate permits will be required are for the installation of electrical, plumbing and mechanical. NOTE: This building is fully fire sprinklered for area increase. All construction shall be per the approved plans and attached comment list. MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/8/200711/8/200711/8/2007PPASS
DetailsForrest France
INSP-Final Inspection11/7/200711/8/200711/8/2007PPASS
DetailsForrest France
Test clean agent panel for monitoring of preaction system and interconnection to main fire alarm panel.KR
Issue and Print Permit  11/7/2007 DONE
Plan assigned to (Mike)10/12/2007 10/23/2007 PASS
10/23/2007 14:12:28 MWT - activity updated through activity FIRA22 from case FIR07-00723.
Alarm Plan Check  10/23/2007 PASS
Fire Alarm Review 3rd
PLANS/APPL TAKEN TO FRONT DESK  10/23/2007  
Ready for Re-Issue
Inspection Record Card- Fire10/23/2007 10/23/2007 DONE
Telephone call  10/23/2007 DONE
t/c w rocky caravano at ###-#### - permit ready and fees given
Permit Ready to Issue  10/23/2007 DONE
Plan resubmittals received  10/22/2007  
Received appliation and three copies of pages FS-1, FS-2, FS-3; taken to fire review
Alarm Plan Check  10/16/2007 FAIL
Fire Alarm Review 2nd Resubmittal Plan Modifications
Telephone call  10/16/2007  
Fax Copy of Review to Applicant Rocky Caravalho ###-####
Telephone call  10/16/2007 DONE
left message w bernie for rocky caravalho at ###-#### - permit needs to be picked up and resubmitted
Plan resubmittals received  10/12/2007  
Received application, detector data sheets, and two copies of FS-1, FS-2, FS-3; taken to fire review
Alarm Plan Check  9/6/2007 PASS
Fire Alarm Review 1st
PLANS/APPL TAKEN TO FRONT DESK  9/6/2007  
Ready for Issue
Inspection Record Card- Fire9/6/2007 9/6/2007 DONE
Telephone call  9/6/2007 DONE
t/c w rocky caravalho at ###-#### - permit ready and fees given
Permit Ready to Issue  9/6/2007 DONE
Plan assigned to (Mike)8/20/2007 8/24/2007 PASS
8/24/2007 08:27:15 MWT - activity updated through activity FIRA22 from case FIR07-00706.
Case Summary  8/20/2007 DONE
Application received  8/20/2007