INSP-Final Inspection | 10/18/2007 | 10/19/2007 | 10/19/2007 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 10/18/2007 | 10/18/2007 | 10/18/2007 | P | FAIL |
Troy Cobbley
|
|
|
The head in the warehouse restroom is still covered and appears to be textured and painted.
|
INSP-Sprinkler Rough-in | 10/3/2007 | 10/4/2007 | 10/5/2007 | P | PART |
Forrest France
|
|
|
OH install is good for cover at the drop ceilings, one head at the warehouse restroom is covered, the SW head at the overhead door in not required due to door configuration, final pending ceiling tile and escutcheons.
|
INSP-Sprinkler Rough-in | 10/3/2007 | 10/4/2007 | 10/3/2007 | P | CANC |
Forrest France
|
|
|
OH Cover Inspection Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/10/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/10/2007 | | 9/10/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/10/2007 | | DONE |
|
|
|
tlk to shaun ramsey ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 9/10/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/10/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/22/2007 | | 9/7/2007 | | PASS |
|
|
|
Plans are approved as Submitted by Bryan Johnson
|
Application received | | | 8/22/2007 | | |
|
|
|
|
Pending Assignment by SAM | 8/22/2007 | | | | |
|
|
|
|