INSP-Final Inspection | 11/28/2007 | 11/28/2007 | 11/28/2007 | P | PASS |
Forrest France
|
|
|
Fire sprinkler work is complete, noted one missing escutcheon at the north corridor to be installed today.
|
INSP-Sprinkler Rough-in/Hydro | 10/1/2007 | 10/1/2007 | 10/1/2007 | A | PART |
Forrest France
|
|
|
Fire sprinkler system modifications are approved for cover at the drop ceilings.
|
Issue and Print Permit | | | 9/6/2007 | | DONE |
|
|
|
|
Application received | | | 8/23/2007 | | |
|
|
|
|
Sprinkler Plan Check | 8/23/2007 | | 8/23/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/23/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/23/2007 | | 8/23/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/23/2007 | | DONE |
|
|
|
t/c w tom dutkus at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 8/23/2007 | | DONE |
|
|
|
|
Pending Assignment by SAM | 8/23/2007 | | | | |
|
|
|
|