INSP-Final Inspection | 1/10/2008 | 1/10/2008 | 1/10/2008 | A | PASS |
Forrest France
|
|
|
Scope of work for this permit finaled. see FIR07-00913 for over head work and additional comments. KR
|
INSP-Final Inspection | 1/8/2008 | 1/9/2008 | 1/9/2008 | A | NR |
Forrest France
|
|
|
Need project related fire alarm permit work inspection.
|
INSP-Sprinkler Rough-in/Hydro | 12/19/2007 | 12/19/2007 | 12/19/2007 | P | PART |
Forrest France
|
|
|
OH hydrostatic test for the basement and 2nd floor wet systems passed inspection.
|
INSP-Sprinkler Rough-in/Hydro | 12/12/2007 | 12/12/2007 | 12/12/2007 | P | PART |
Forrest France
|
|
|
Over head hydro 1st floor passed.See approved set of plans for any red lined areas.KR
|
INSP-Sprinkler Rough-in/Hydro | 11/30/2007 | 11/30/2007 | 11/30/2007 | P | PART |
Forrest France
|
|
|
See approved plan set for areas inspected today.
|
INSP-Conference | 10/1/2007 | 10/1/2007 | 10/1/2007 | A | DONE |
Forrest France
|
|
|
On site conference to discuss project shell and tenant work interface, also discussed second floor ceilings.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/14/2007 | | DONE |
|
|
|
tlk to tom dutkus ###-#### that permit and fees are ready to be picked up
|
Inspection Record Card- Fire | 9/14/2007 | | 9/14/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/14/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/14/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/24/2007 | | 9/11/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Case Summary | | | 8/24/2007 | | |
|
|
|
|
Application received | | | 8/24/2007 | | |
|
|
|
|
Pending Assignment by SAM | 8/24/2007 | | | | |
|
|
|
|