INSP-Final Inspection | 9/17/2007 | 9/18/2007 | 9/18/2007 | A | PASS |
Forrest France
|
|
|
Install had been covered prior to rough-in inspection request, contractor was provided on site to expose work for inspection as needed, noted three retaining straps at beam clamps which were not secured correctly-contractor agreed to repair today, need to install missing ceiling tile at the corridor, field modifications in pipe routing noted and accepted, fire sprinkler permit finaled.
|
Issue and Print Permit | | | 9/17/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/14/2007 | | DONE |
|
|
|
tlk to steve johnson ###-#### that permit and fees are ready to be picked up
|
Inspection Record Card- Fire | 9/14/2007 | | 9/14/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/14/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/24/2007 | | 9/12/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Miscellaneous action | | | 8/30/2007 | | DONE |
|
|
|
Approved Early Start request to install 10 pendant heads and relocate 3 upright heads. Document attached
|
Application received | | | 8/24/2007 | | |
|
|
|
|
Pending Assignment by SAM | 8/24/2007 | | | | |
|
|
|
|