INSP-Final Inspection | 4/7/2008 | 4/9/2008 | 4/9/2008 | A | PASS |
Forrest France
|
|
|
Fire alarm permit finaled, inspection passed.
|
FIR-Aging Inspection | 1/10/2008 | 1/10/2008 | 1/10/2008 | | DEFR |
Forrest France
|
|
|
wip
|
Alarm Plan Check | 12/6/2007 | | 12/6/2007 | | DONE |
|
|
|
Revised plans provided to show the project work extends through the fire wall separating 24C and 24D. The revised plan set shows work in both buildings with no protection for a proposed conveyor opening in the wall. The fire alarm work is approved, but is subject to verification by the Building Dept that the existing firewall separating 24C and 24D can be eliminated; P.D. Marcolina is to provide that information to J. Menard later.
|
Issue and Print Permit | | | 9/6/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2007 | | DONE |
|
|
|
|
Alarm Plan Check | | | 8/29/2007 | | DONE |
|
|
|
Onsite plan review; open adjacent areas not shown, therefore coverage and spacing was approved subject to verification by Fire Inspector as noted on sheet FA2.1.
|
Application received | | | 8/28/2007 | | DONE |
Mary Froemke
|
|
|
This permit was created on the web by Paul Marcolina
|
Application received | | | 8/28/2007 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|