Case Summary | | | 8/23/2016 | | DONE |
|
|
|
|
Miscellaneous action | | | 3/10/2009 | | DONE |
|
|
|
Sending for archive
|
INSP-Final Inspection | 12/10/2008 | 12/10/2008 | 12/11/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 12/9/2008 | 12/9/2008 | 12/9/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 12/2/2008 | 12/2/2008 | 12/2/2008 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### Internet Inspection Request from: John Warnick
|
INSP-Sprinkler Rough-in/Hydro | 11/26/2008 | 11/26/2008 | 11/26/2008 | P | FAIL |
Troy Cobbley
|
|
|
Flow switch has not been wired to the alarm bell, not all ceilings have been finished, missing escheons and exposed cpvc piping under the east basement stairs. Also a sprinkler head at the top of the west stairs, first floor, needs to be relocated away from a can light or an intermediate temperature head needs to be installed as per 7.5.5.3 of NFPA 13D.
|
INSP-Final Inspection | 11/24/2008 | 11/25/2008 | 11/25/2008 | A | CANC |
Troy Cobbley
|
|
|
vance Phone #: ###-#### Inspection cancelled from web by: John Warnick
|
INSP-Final Inspection | 4/1/2008 | 4/2/2008 | 4/2/2008 | P | FAIL |
Troy Cobbley
|
|
|
Project was not complete. Ceiling finishes had not been completed yet (both painted and wood). I noted to the sprinkler contractor several sprinkler esch. that had been painted. Bell was not installed yet.
|
INSP-Final Inspection | 4/1/2008 | 4/2/2008 | 4/1/2008 | A | CANC |
Troy Cobbley
|
|
|
terry Phone #: ###-#### Inspection cancelled from web by: John Warnick
|
INSP-Supply line flush | 1/10/2008 | 1/10/2008 | 1/10/2008 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 10/26/2007 | 10/29/2007 | 10/29/2007 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover. I let the builder and on a previous visit the owner know my concerns that the tenting is maintained and that adequate insulation is provided.
|
INSP-Sprinkler Rough-in | 10/25/2007 | 10/26/2007 | 10/26/2007 | A | FAIL |
Troy Cobbley
|
|
|
The tenting is still inadequate in areas. I did not find the framer when I was on site but the builder called me later and I let him know the areas of concern. He will fix these and call it back in for monday.
|
INSP-Sprinkler Rough-in | 10/25/2007 | 10/25/2007 | 10/26/2007 | P | CANC |
Troy Cobbley
|
|
|
Overbooked with micron
|
INSP-Sprinkler Rough-in | 10/23/2007 | 10/24/2007 | 10/24/2007 | P | FAIL |
Troy Cobbley
|
|
|
There are still major tenting issues. I went over them with the fire sprinkler contractor and the framer.
|
INSP-Sprinkler Rough-in/Hydro | 10/15/2007 | 10/16/2007 | 10/16/2007 | P | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for locations where sprinkler pendants and sidewalls are overspaced. The tenting is inadequate and/or missing in many locations. Also the piping in supposed heated areas is open to unheated areas. In several locations the piping has been rerouted and additional heads have been added due to architectural features. Provide asbuilt plans prior to cover approval.
|
Issue and Print Permit | | | 10/4/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/21/2007 | | 9/21/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/21/2007 | | DONE |
|
|
|
left message w susan for john venche at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 9/21/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/6/2007 | | 9/20/2007 | | PASS |
|
|
|
plans are approved with conditions as submitted by bryan johnson
|
Miscellaneous action | | | 9/10/2007 | | DONE |
|
|
|
Approved Early Start request, to rough-in stage only. Document attached.
|
Application received | | | 9/6/2007 | | |
|
|
|
|
Pending Assignment by SAM | 9/6/2007 | | | | |
|
|
|
|