INSP-Final Inspection | 11/15/2007 | 11/16/2007 | 11/16/2007 | A | PASS |
Forrest France
|
|
|
Noted field modifications, permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 11/7/2007 | 11/7/2007 | 11/7/2007 | P | PART |
Forrest France
|
|
|
Conference to discuss fire sprinkler head locations as field installed.
|
INSP-Conference | 11/5/2007 | 11/6/2007 | 11/7/2007 | A | NH |
Forrest France
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Berry
|
INSP-Conference | 10/31/2007 | 11/1/2007 | 11/1/2007 | A | NR |
Forrest France
|
|
|
Inspection rescheduled per contractor.
|
Issue and Print Permit | | | 9/13/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/11/2007 | | |
|
|
|
|
Plan assigned to (Scott) | | | 9/6/2007 | | DONE |
Bill Alexander
|
|
|
This permit was created on the web by Paul Marcolina
|
Application received | | | 9/6/2007 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|
Sprinkler Plan Check | | | 9/6/2007 | | DONE |
|
|
|
on site review by T. Cobbley.
|