INSP-Final Inspection | 12/12/2007 | 12/12/2007 | 12/12/2007 | P | PASS |
Forrest France
|
|
|
Fire sprinkler final inspection passed, one missing escutcheon installed while on site.
|
INSP-Sprinkler Rough-in | 11/14/2007 | 11/14/2007 | 11/15/2007 | P | PART |
Forrest France
|
|
|
Install is okay for cover at the drop ceilings, noted one existing head at the reception area in need of removal.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/9/2007 | | DONE |
|
|
|
lft vm with brodie stenquist ###-#### that permit and fees are ready to be picked up
|
Inspection Record Card- Fire | 10/9/2007 | | 10/9/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/9/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/9/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/24/2007 | | 10/8/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Application received | | | 9/24/2007 | | |
|
|
|
|
Pending Assignment by SAM | 9/24/2007 | | | | |
|
|
|
|