Permit Information
Permit NumberFIR07-00803
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 314 S 9TH ST Unit: 101
Project NameBODO BLDG #4-Foster Bldg
Customer Number 
ePlanReview 
Description
overheadThe Permitted Work Scope: Over Head Only
Add and relocate heads to accommodate a new wall and ceiling layout on the First floor & Basement of this 4 story office bldg. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD07-01673. When tenant work affects fire sprinkler protection outside the permitted work area due to the installation of tenant-demising or new partition walls, the affected area sprinkler coverage outside the BLD permit will fall under the Fire Permit scope of work, to maintain the required fire protection within the fire sprinklered facility. The "Riser" and its supplies which include all appurtenances (including tamper, alarm and alarm monitoring) relating to the normal and correct function and integrity of this system will fall under the jurisdiction for code compliant verification.10/31/07 Revised Work Scope: Over Head Only
Add and relocate heads to accommodate a Tenant build out on the first floor and in the basement. (24) Heads are affected in this plan modification of these previously approved plans. The revision is noted as Rev. 1 dated 10/19/07.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/12/200712/12/200712/12/2007PPASS
DetailsForrest France
All corrections made,per last inspection notes. KR
INSP-Final Inspection12/4/200712/6/200712/6/2007AFAIL
DetailsForrest France
Missing caps at the FDC, need to remove the allen wrench from the flow switch at the main riser and replace the cover ASAP, provide a current annual inspection for the existing system, need resubmitted plans available on site at the next inspection.
Issue and Print Permit  11/7/2007 DONE
Inspection Record Card- Fire11/6/2007 11/6/2007 DONE
Telephone call  11/6/2007 DONE
tlk to shawn ramsey ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  11/6/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/2/2007 DONE
Sprinkler Plan Check10/24/2007 10/31/2007 PASS
This was a review of a previously approved plan which affected 24 heads. This plan was submitted as a plan modification due to tenant build out by bryan johnson
INSP-Sprinkler Rough-in10/29/200710/30/200710/30/2007APART
DetailsForrest France
Okay for sheetrock install at the basement level and the first floor restrooms, contractor to comply with listed min. spacing requirements of the residential heads installed, noted possible light fixture obstructions due to close proximity of heads and electrical junction boxes at some locations, will need resubmitted plans at next inspection for verification of field mods.
Plan resubmittals received  10/24/2007  
received fire app (2) pages & letter of transmittal from debest, & "5" sets of plans-- plans put on fire shelf
Issue and Print Permit  10/10/2007  
PLANS/APPL TAKEN TO FRONT DESK  10/9/2007  
Telephone call  10/9/2007 DONE
tlk to shaun ramsey ###-#### that permit and fees are ready to be picked up
Inspection Record Card- Fire10/9/2007 10/9/2007 DONE
Permit Ready to Issue  10/9/2007 DONE
Sprinkler Plan Check9/25/2007 10/8/2007 PASS
Plans approved as submitted by Bryan Johnson
Case Summary  9/25/2007  
Application received  9/25/2007  
Pending Assignment by SAM9/25/2007