INSP-Final Inspection | 5/9/2008 | 5/12/2008 | 5/12/2008 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Conference | 3/24/2008 | 3/25/2008 | 3/28/2008 | A | DONE |
Troy Cobbley
|
|
|
I met with the owner, Chad, and Mark Sentenno at the project site. Mark agreed that the suppression system would not be required to be extended into the "Prep Area" as long as the area was used as per the restrictions of IFC chapter 15. See 1502 definitions of limited spray space.
|
Issue and Print Permit | | | 3/21/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/11/2008 | | 3/11/2008 | | PASS |
Scott Arellano
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/11/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/11/2008 | | 3/11/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 3/11/2008 | | DONE |
|
|
|
lft vm with don kartchner ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 3/11/2008 | | DONE |
|
|
|
|
Telephone call | | | 3/10/2008 | | DONE |
|
|
|
Fire expert called checking on status of FIR permit. Informed contractor that the original resubmittal itmes have not been addressed. Refaxed original review to Fire Expert (contractor).
|
Miscellaneous action | | | 3/10/2008 | | DONE |
|
|
|
*Resubmittals received.*Received floor plan sheet indicating location of 2nd required Dry chemical cylinder (PCI 17 ABC) and visual notification divice.
|
Sprinkler Plan Check | 9/28/2007 | | 9/28/2007 | | FAIL |
|
|
|
Faxed resubmittal items to applicant. Attached review comments to plans.
|
Application received | | | 9/25/2007 | | |
|
|
|
|
Pending Assignment by SAM | 9/25/2007 | | | | |
|
|
|
|