Case Summary | | | 12/12/2008 | | DONE |
|
|
|
|
INSP-Final Inspection | 12/13/2007 | 12/13/2007 | 12/13/2007 | P | PASS |
Forrest France
|
|
|
Permit finaled.
|
INSP-Final Inspection | 12/12/2007 | 12/13/2007 | 12/13/2007 | A | PASS |
Forrest France
|
|
|
Fire sprinkler passed final inspection, permit finaled.
|
INSP-Sprinkler Rough-in | 12/3/2007 | 12/4/2007 | 12/4/2007 | A | PART |
Forrest France
|
|
|
Noted correction item from the previous inspection has been completed, OH rough-in is acceptable.
|
INSP-Sprinkler Rough-in | 11/30/2007 | 12/3/2007 | 12/3/2007 | A | PART |
Troy Cobbley
|
|
|
The office sprinkler piping is ok to cover but an additional upright head needs added by the overhead door where existing coverage is blocked.
|
INSP-Sprinkler Rough-in | 11/30/2007 | 11/30/2007 | 12/3/2007 | P | CANC |
Troy Cobbley
|
|
|
OH Cover inspection Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2007 | | |
|
|
|
|
Inspection Record Card- Fire | 10/17/2007 | | 10/17/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/17/2007 | | DONE |
|
|
|
lft ms with receptionist for shawn ramsey ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 10/17/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/17/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/3/2007 | | 10/16/2007 | | PASS |
|
|
|
Plans approved as submitted by Bryan Johnson
|
Application received | | | 10/3/2007 | | |
|
|
|
|
Pending Assignment by SAM | 10/3/2007 | | | | |
|
|
|
|