INSP-Final Inspection | 8/19/2008 | 8/20/2008 | 8/20/2008 | A | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Supply line flush | 3/26/2008 | 3/27/2008 | 3/27/2008 | P | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory post hydrostatic test.
|
INSP-Sprinkler Rough-in/Hydro | 3/26/2008 | 3/27/2008 | 3/27/2008 | A | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic test passed inspection.
|
INSP-Sprinkler Rough-in | 11/15/2007 | 11/15/2007 | 11/15/2007 | P | PART |
Forrest France
|
|
|
UG fire supply line is approved for cover, need to provide method for seismic clearance at the floor slab.
|
Issue and Print Permit | | | 10/9/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/8/2007 | | 10/8/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/8/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/8/2007 | | 10/8/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/8/2007 | | DONE |
|
|
|
tlk to sam ball ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 10/8/2007 | | DONE |
|
|
|
|
Application received | | | 10/4/2007 | | |
|
|
|
|
Pending Assignment by SAM | 10/4/2007 | | | | |
|
|
|
|