DOC - Permit Finaled | | | 8/11/2008 | | DONE |
|
|
|
|
INSP-Final Inspection | 3/19/2008 | 3/20/2008 | 3/20/2008 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 12/6/2007 | 12/6/2007 | 12/6/2007 | P | PART |
Forrest France
|
|
|
Fire sprinkler work is acceptable for phase 1 only of the permit scope.
|
INSP-Sprinkler Rough-in | 12/3/2007 | 12/3/2007 | 12/3/2007 | P | FAIL |
Troy Cobbley
|
|
|
Provide additional sprinkler coverage in the beam pocket as marked on the plans. Provide additional coverage below the old MRI ceiling or remove the ceiling as marked on the plans. This inspection was for only a portion of the scope of work. The sprinkler piping in this phase that is not one of the two deficiencies listed above is ok to cover.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/29/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/29/2007 | | 10/29/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/29/2007 | | DONE |
|
|
|
lft vm with brodie ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 10/29/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/29/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/15/2007 | | 10/25/2007 | | PASS |
|
|
|
Plans approved as submited by Bryan Johnson
|
Application received | | | 10/15/2007 | | |
|
|
|
|
Pending Assignment by SAM | 10/15/2007 | | | | |
|
|
|
|