Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR07-00860
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 300 E JEFFERSON ST
Project NameST LUKES MOB-1ST FLR
Customer Number 
ePlanReview 
Description
Permitted Work Scope: Over Head Only
Modify the existing system by adding and relocating heads on the 3rd Floor to accommodate a new ceiling layout. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD07-01229.
When tenant work affects fire sprinkler protection outside the permitted work area due to the installation of tenant-demising or new partition walls, the affected area sprinkler coverage outside the BLD permit will fall under the Fire Permit scope of work, to maintain the required fire protection within the fire sprinklered facility. The “Riser” and its supplies which include all appurtenances (including tamper, alarm and alarm monitoring) relating to the normal and correct function and integrity of this system will fall under the jurisdiction for code compliant verification.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  8/11/2008 DONE
INSP-Final Inspection3/19/20083/20/20083/20/2008APASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Final Inspection12/6/200712/6/200712/6/2007PPART
DetailsForrest France
Fire sprinkler work is acceptable for phase 1 only of the permit scope.
INSP-Sprinkler Rough-in12/3/200712/3/200712/3/2007PFAIL
DetailsTroy Cobbley
Provide additional sprinkler coverage in the beam pocket as marked on the plans. Provide additional coverage below the old MRI ceiling or remove the ceiling as marked on the plans. This inspection was for only a portion of the scope of work. The sprinkler piping in this phase that is not one of the two deficiencies listed above is ok to cover.
PLANS/APPL TAKEN TO FRONT DESK  10/29/2007 DONE
Inspection Record Card- Fire10/29/2007 10/29/2007 DONE
Telephone call  10/29/2007 DONE
lft vm with brodie ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  10/29/2007 DONE
Issue and Print Permit  10/29/2007 DONE
Sprinkler Plan Check10/15/2007 10/25/2007 PASS
Plans approved as submited by Bryan Johnson
Application received  10/15/2007  
Pending Assignment by SAM10/15/2007