INSP-Final Inspection | 12/17/2007 | 12/19/2007 | 12/19/2007 | A | PASS |
Forrest France
|
|
|
Corrections completed, fire sprinkler permit finaled.
|
INSP-Final Inspection | 12/10/2007 | 12/14/2007 | 12/14/2007 | A | PART |
Forrest France
|
|
|
Still missing required hanger support at one location, remaining work accepted.
|
INSP-Final Inspection | 12/14/2007 | 12/17/2007 | 12/14/2007 | A | CANC |
Forrest France
|
|
|
Brian D is the contact, thank you. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 11/13/2007 | 11/14/2007 | 11/14/2007 | A | PART |
Forrest France
|
|
|
Need to add hangers for arm-overs at some locations due to static pressures exceeding 100psi., remiander of OH mods are acceptable per site visit by K. Roule.
|
Sprinkler Plan Check | 10/24/2007 | | 10/24/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/24/2007 | | 10/24/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/24/2007 | | DONE |
|
|
|
tlk to lilly ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 10/24/2007 | | |
|
|
|
|
Issue and Print Permit | | | 10/24/2007 | | |
|
|
|
|
Application received | | | 10/22/2007 | | |
|
|
|
|
Pending Assignment by SAM | 10/22/2007 | | | | |
|
|
|
|