INSP-Final Inspection | 12/17/2007 | 12/17/2007 | 12/17/2007 | P | PASS |
Forrest France
|
|
|
Corrections verified, per GC the closet at the SW side of the tenant area is to be constructed as well as the soffit at the NW corner.
|
INSP-Final Inspection | 12/13/2007 | 12/13/2007 | 12/13/2007 | P | FAIL |
Forrest France
|
|
|
Noted locations on the plan in need of revision including one blocked head, one head to be replaced, one pendent is too low, spacing at one area if a closet is not built as indicated on plans.
|
INSP-Sprinkler Rough-in | 11/1/2007 | 11/2/2007 | 11/2/2007 | P | PART |
Forrest France
|
|
|
OH rough-in completed satisfactory, inspection passed per site visit by S. Arellano.
|
Issue and Print Permit | | | 10/25/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/24/2007 | | 10/24/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/24/2007 | | DONE |
|
|
|
tlk to brodie ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 10/24/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/24/2007 | | 10/24/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2007 | | DONE |
|
|
|
|
Application received | | | 10/23/2007 | | |
|
|
|
|
Pending Assignment by SAM | 10/23/2007 | | | | |
|
|
|
|
Inspection Record Card- Fire | 10/24/2007 | | | | |
|
|
|
|