INSP-Final Inspection | 7/16/2008 | 7/16/2008 | 7/16/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 4/23/2008 | 4/25/2008 | 4/25/2008 | P | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 4/22/2008 | 4/23/2008 | 4/23/2008 | A | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic testing passed inspection.
|
INSP-Sprinkler Rough-in | 11/19/2007 | 11/20/2007 | 11/20/2007 | P | PART |
Forrest France
|
|
|
UG fire supply line is approved for cover, the hydrant at the street appears to be supplied by a dedicated line and is installed separate from the automatic sprinkler system supply per the general contractor.
|
Sprinkler Plan Check | 10/30/2007 | | 10/30/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/30/2007 | | 10/30/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/30/2007 | | DONE |
|
|
|
t/c w shaun ramsey at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 10/30/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/30/2007 | | DONE |
|
|
|
|
Application received | | | 10/29/2007 | | |
|
|
|
|
Pending Assignment by SAM | 10/29/2007 | | | | |
|
|
|
|