INSP-Final Inspection | 2/5/2008 | 2/6/2008 | 2/6/2008 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 1/4/2008 | 1/7/2008 | 1/7/2008 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping in the lobby area is ok to cover. One head needs to be brought out to provide adequate spacing as discussedl. This will be checked at the final.
|
Override - Parcel Holds | 1/4/2008 | 1/1/1900 | 1/4/2008 | | |
|
|
|
rough in only
|
INSP-Sprinkler Rough-in/Hydro | 11/13/2007 | 11/15/2007 | 11/15/2007 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler piping in the lobby is ok to cover
|
Issue and Print Permit | | | 11/2/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/1/2007 | | 11/1/2007 | | DONE |
|
|
|
|
Telephone call | | | 11/1/2007 | | DONE |
|
|
|
left vm for brad bettencourt at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 11/1/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/31/2007 | | 10/31/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/31/2007 | | DONE |
|
|
|
|
Application received | | | 10/30/2007 | | |
|
|
|
|
Pending Assignment by SAM | 10/30/2007 | | | | |
|
|
|
|